My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Mark Thomas & Company
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Mark Thomas & Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2009 12:48:36 PM
Creation date
11/9/2005 12:28:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Company
PROJECT NAME
pro consulting engineering services
RMP File Number
304
Date
11/1/2005
MO Ref
05-193
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT -A- <br /> <br />April 3, 2009 <br /> <br />File No. 55-0285B <br /> <br />Mr. Peter V orametsanti <br />Engineering & Construction <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />RE: Route 101/ Ralston Avenue Landscaping Project <br />PROPOSAL FOR EXTRA WORK . <br /> <br />Dear Mr. V orametsanti: <br /> <br />Weare pleased to submit this proposal for additional design services for the Route <br />lOl/Ralston Avenue Interchange Landscaping Project. These additional services have come <br />about due to: (a) an extension of the project landscaping limits along Ralston Avenue from <br />Route 101 to Hiller Street per Belmont's request and (b) addition of bid and construction <br />support to the oliginal scope. <br /> <br />-SCOPE OF EXTRA WORK <br /> <br />Task 1 - Extend Ralston Avenue Landscaping Limits <br /> <br />. Include design of additional landscaping and irrigation system for <br />approximately 530 feet along the south side of Ralston Avenue between Route <br />101 on/off ramps and Hiller Street into the original Landscaping PS&E <br />package (actual design done under separate contract. between Sugimura and <br />City of Belmont) <br />. Include design of additional landscaping and in-igation system for the SB <br />Route 101 loop on-ramp into the original Landscaping PS&E package (actual <br />design done under separate contract between Sugimura and City of Belmont) <br /> <br />Task 2 - Update Bid Package <br /> <br />. Update Landscaping PS&E construction documents (Includes additional <br />MTCo time for preparing combined construction documents and coordination) <br />. Work with City of Belmont to incorporate a pOltion of their landscaping into <br />the original Landscaping PS&E package <br />. Revise specifications and estimate to reflect design modifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.