My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-11-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-11-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2005 10:23:18 AM
Creation date
11/10/2005 11:40:46 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
11/14/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />%1-z7 <br /> <br />Potentially Significant <br />Unless Mitigation <br />Inco oration <br /> <br /> <br />and currently provides bus transportation. <br /> <br /> <br />a) Exceed wastewater treatment requirements of the applicable Regional Water <br />Quality Control Board? <br /> <br />The South Bayside System Authority (SBSA) operates the regional wastewater <br />treatment facility, located at the eastern end of the Redwood Shores peninsula. <br />Redwood City is a member agency of this authority, and has adequate <br />capacity rights for the existing land uses. Given the fact that no intensification <br />of land uses are associated with the implementation of this project no impact <br />is anticipated. Should the re-zoning of the property result in future <br />development of the site, the potential impacts of that project would be assessed <br />at the time of the future projects entitlements. <br /> <br />b) Require or result in the construction of new water or wastewater treatment <br />facilities or expansion of existing facilities, the construction of which could <br />cause significant environmental effects? <br /> <br />See section XVI a) above. <br /> <br />c) <br /> <br />Require or result in the construction of a new storm water drainage facilities or <br />expansion of existing facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />See section XVI a) above. <br /> <br />d) Have sufficient water supplies available to serve the project from existing <br />entitlements and resources, or are new or expanded entitlements needed? <br /> <br />The San Francisco Retch Retchy regional water system is the source of <br />Redwood City's drinking water supply. According to the Public Works <br />Department, the City is consuming one-thousand (1000) acre-feet per year <br />over the contractual supply assurance 12,243 acre-feet per year from the <br />Retch Rectchy regional water system. The proposed project will not result in <br />the addition of any structures or land uses that would place additional demand <br />on the water supply of the existing land uses; therefore no impact will occur as <br />a result of the proposed project. <br /> <br />Although staff has determined that no increase in water demand is expected <br />and the proposed project will have little effect on the existing supply of water, <br />staff recommends that the project proponents participate in the City's <br />sponsored Water Conservation Programfor indoor and outdoor water use. <br /> <br />e) <br /> <br />Result in a determination by the wastewater treatment provider that serves or <br />may serve the project that it has adequate capacity to serve the project's <br />projected demand in addition to the provider's existing commitments? <br /> <br />See section XVI a) above. <br /> <br />t) <br /> <br /> <br />18 <br /> <br />x <br /> <br />x <br /> <br />x <br /> <br />x <br /> <br />x <br /> <br />x <br />
The URL can be used to link to this page
Your browser does not support the video tag.