activities would be scheduled for daytime hours when the ambient noise levels are highest. <br />[SDR][BUILDING] <br />54. Construction Sign - Prior to the start of any construction work, including demolition, <br />install at least one 36" x 48" (minimum) construction sign in a visible location along the <br />project frontage for the duration of construction. The sign shall include, at minimum, the <br />following information: project name & address, elevation or rendering, construction <br />manager (name, phone number), anticipated completion (season, year), and the City's <br />permitting website htto: / /nermits.redwoodcitv.org [COA] [PLANNING] <br />55. Construction Meetings - The applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA] [BUILDING] <br />a. Pre -Submittal - Prior to building permit submittal, schedule a pre -submittal <br />meetingwith Building, Planning, Engineering and Fire staff to discuss the permitting <br />process and submittal requirements. <br />b. Pre -Construction - After City permits are issued, but prior to start of construction, <br />schedule a pre -construction meeting with Engineering, Building, Fire, and Planning <br />staff to discuss the inspection process and requirements for construction and site <br />work. The applicant shall arrange for the attendance of the owner, developer, <br />construction manager, contractor, and all subcontractors who are responsible for <br />grading and erosion and sedimentation protection controls. <br />56. Materials Mock -Up - Prior to final foundation inspection, prepare a mock-up that is <br />outdoors, readily accessible, and will remain intact until the project has reached <br />substantial completion. The mock-up should include all project colors and materials, <br />windows for the base and top, balconies, lighting, and architectural details, as well as <br />construction details, such as the weep screed, to understand how the design addresses <br />them. Then schedule a mock-up meeting with the Planning and Building Departments <br />for final review and approval of the project details. Submit an updated colors and <br />materials board or details if any changes are made as a result of the mock-up meeting. <br />[CCA] [PLANNING] <br />57. Certification Letters - Prior to final inspection, submit certification letters from the <br />following architects verifying that the project, as constructed, complies with approved <br />plans. After the certification letter has been submitted, the project planner will also confirm <br />substantial compliance with the approved plans during the scheduled final inspection. <br />[COA] [PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance with the approved <br />landscape plan, including species, size, quantity, and location of the approved trees, <br />shrubs, and groundcover. It shall also verify landscape lighting, fencing, irrigation, <br />and other details as applicable. <br />b. Project Architect verifying substantial conformance with the approved elevations, <br />colors, materials, exterior light fixtures, and architectural details. <br />ATTY/RESO.0008/PC RESO APPROVING PC & PD AT 1175 MARSHALL STREET <br />REV: 02-07-18 PR <br />Page 14 of 16 <br />