activities would be scheduled for daytime hours when the ambient noise levels are highest.
<br />[SDR][BUILDING]
<br />54. Construction Sign - Prior to the start of any construction work, including demolition,
<br />install at least one 36" x 48" (minimum) construction sign in a visible location along the
<br />project frontage for the duration of construction. The sign shall include, at minimum, the
<br />following information: project name & address, elevation or rendering, construction
<br />manager (name, phone number), anticipated completion (season, year), and the City's
<br />permitting website htto: / /nermits.redwoodcitv.org [COA] [PLANNING]
<br />55. Construction Meetings - The applicant is required to contact the Permit Counter
<br />(650.780.7350) to schedule the following meetings prior to or during construction.
<br />[COA] [BUILDING]
<br />a. Pre -Submittal - Prior to building permit submittal, schedule a pre -submittal
<br />meetingwith Building, Planning, Engineering and Fire staff to discuss the permitting
<br />process and submittal requirements.
<br />b. Pre -Construction - After City permits are issued, but prior to start of construction,
<br />schedule a pre -construction meeting with Engineering, Building, Fire, and Planning
<br />staff to discuss the inspection process and requirements for construction and site
<br />work. The applicant shall arrange for the attendance of the owner, developer,
<br />construction manager, contractor, and all subcontractors who are responsible for
<br />grading and erosion and sedimentation protection controls.
<br />56. Materials Mock -Up - Prior to final foundation inspection, prepare a mock-up that is
<br />outdoors, readily accessible, and will remain intact until the project has reached
<br />substantial completion. The mock-up should include all project colors and materials,
<br />windows for the base and top, balconies, lighting, and architectural details, as well as
<br />construction details, such as the weep screed, to understand how the design addresses
<br />them. Then schedule a mock-up meeting with the Planning and Building Departments
<br />for final review and approval of the project details. Submit an updated colors and
<br />materials board or details if any changes are made as a result of the mock-up meeting.
<br />[CCA] [PLANNING]
<br />57. Certification Letters - Prior to final inspection, submit certification letters from the
<br />following architects verifying that the project, as constructed, complies with approved
<br />plans. After the certification letter has been submitted, the project planner will also confirm
<br />substantial compliance with the approved plans during the scheduled final inspection.
<br />[COA] [PLANNING]:
<br />a. Project Landscape Architect verifying substantial conformance with the approved
<br />landscape plan, including species, size, quantity, and location of the approved trees,
<br />shrubs, and groundcover. It shall also verify landscape lighting, fencing, irrigation,
<br />and other details as applicable.
<br />b. Project Architect verifying substantial conformance with the approved elevations,
<br />colors, materials, exterior light fixtures, and architectural details.