Laserfiche WebLink
Fees <br />The following fees must be paid in full prior to issuance of the building permit unless otherwise <br />described below. <br />4. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from <br />the proposed project, to be determined at time of building permit issuance. [SDR] <br />[ENGINEERING] <br />5. School Impact Fee - For residential additions greater than 500 square feet and new <br />commercial or industrial construction, pay a School Impact Fee to the Seouoia Union Hivh <br />School District. Information regarding this fee may be obtained by contacting the Sequoia <br />Union High School District at (650) 369-1411. [SDR] [SCHOOL DISTRICT] <br />6. Water and Sewer Fees - Pay applicable water, recycled water, and wastewater -related <br />fees as outlined on the Citv's website. [SDE] [ENGINEERING] <br />7. Notice of Fees Protest - The applicant may protest any fees, dedications, reservations, or <br />other exactions imposed by the City as part of the approval or as a condition of approval of <br />this development. Per California Government Code Section 66020, this 90 -day protest <br />period has begun as of the date of the approval of this application. [SDR] [OFFICE OF THE <br />CITY ATTORNEY] <br />Landscanine and Site Improvements <br />8. Water -Efficient Landscaping - Provide a landscaping and irrigation plan conforming to <br />the California Water -Efficient Landscape Ordinance (AB 1881), including an automatic <br />irrigation system (drip, micro -spray, or bubblers) with a rain sensor, and show these <br />measures on the building permit plans. [COA] [PLANNING] <br />9. Tree Survey - Provide a tree survey that identifies type, diameter at breast height (DBH), <br />condition and location prior to building permit issuance. [COA][PLANNING] <br />10. Tree Protection - Provide tree protection measures for ordinance -sized trees near the <br />project and show these measures on the building permit plans. [COA] [PLANNING] <br />11. Street Trees - Street trees shall be planted along Maple and Marshall Street frontages. The <br />tree species and location will be determined by the City Engineer and Planning Manager. <br />These improvements shall be included as part of the building permit submittal package. <br />Newly planted trees shall be both irrigated and maintained by the applicant. <br />SDR] [PLANNING] <br />12. Stormwater Runoff - Post -construction runoff into the storm drain shall not exceed pre - <br />construction runoff levels. The applicant's design professional shall evaluate the project's <br />impact to the City's storm drainage system and shall substantiate their conclusions with <br />drainage calculations to the satisfaction of the City Engineer. The project shall be designed <br />in conformance with the Drainage Guidelines for Commercial Development. [SDR] <br />[ENGINEERING] <br />ATTY/RESO.0008/PC RESO APPROVING PC & PD AT 1175 MARSHALL STREET <br />REV: 02-07-18 PR <br />Page 6 of 16 <br />