DRAFT dOWNTOWN pARKS site aSSESSMENT & fEASIBILITY sTUDY REPORT26IV COST FORECASTSITE 01: Winslow Street The Winslow Street site has minimal existing utility constraints and signifi cant available space for new programing ideas. Possible construction costs beyond the baseline assumptions may include sidewalk replacement to accommodate additional path connections and street improvements to enhance pedestrian crossing. Potential park program could include an interactive water feature, park shelter, paved plaza, play area and lawn area. SITE 02: Library Campus/ Roselli Park Cost implications to consider in addition to baseline assumptions for the Library Campus and Roselli Park site include potential fi ber optic infrastructure impacts, new connections to the existing storm drain culvert, and re-grading the existing frontage slope along Jefferson Ave. Potential park program could include a park shelter, paved plaza, play area, and lawn area. The overall cost of park improvements will be affected by whether Lot A or Lot B or Roselli or some combination of the three is developed. The cost estimate assumes that one-third of the site of 41,000 SF will be improved. SITE 03: City HallThis centrally located site currently contains large existing utility structures that may heighten construction costs. Potential cost items to note are storm drain culvert structures which may require adjustment to grade, above grade utility cabinet relocations, and service and emergency vehicle site access requirements. Potential park program could include an interactive water feature, park shelter, paved plaza, play area, lawn area, and garden . The overall cost will be affected by the physical extent of the site improvements. Due to the overall size and confi guration there could be options for improving all or a portion of the site.Cost Considerations BASELINE COST ASSUMPTIONS & CONSIDERATIONS7.B. - Page 31