Laserfiche WebLink
<br /> <br />City of Redwood City Page 33 <br />Sewer System Management Plan, March 2018 Element IV <br />The City’s sewer pipeline CCTV contractor inspects sewer manholes as part of the same <br />inspection contract. The inspection contractor performs a visual inspection of the manhole <br />structure and documents the manhole inspection using a Sewer Manhole Inspection Form <br />included in Appendix IV-8. The annual results of CCTV inspections for the past eight fiscal <br />years are contained in Table IV-3 below. <br />Table IV-3 : Historical Results of Closed Circuit Television <br />Calendar Year <br />CCTV Performance <br />linear feet <br />CCTV Performance, <br />Miles <br />Percent of the <br />System <br />2007/2008 32,800 6.21 4.20% <br />2008/2009 108,315 20.51 13.87% <br />2009/2010 65,902 12.48 8.44% <br />2010/2011 68,905 13.05 8.82% <br />2011/2012 65,336 12.37 8.37% <br />2012/2013 106,370 20.15 13.62% <br />2013/2014 104,618 19.81 13.40% <br />2014/2015 105,378 19.96 13.49% <br />2015/2016 123,383 23.37 15.8% <br />Total 781,007 147.91 100.00 <br />Average 86,778 16.44 100.00 <br /> <br />The wastewater collection system staff maintains a list of known structural deficiencies <br />determined from the PACP priority ranking system and the manhole inspection reports. This list <br />is maintained in priority order from the field observations or repairs are made depending upon <br />the nature of the deficiency. <br />IV-8.2 Sewer Pipeline and Manhole Condition Assessment, Rehabilitation <br />Planning, and Prioritization <br />The City’s Community Development Department, Engineering and Transportation Division is <br />responsible for performing sewer and manhole condition assessment and sewer rehabilitation <br />planning. The City has developed an internal inspection data review process for performing <br />sewer condition assessments. Inspection and video data are linked using the City’s geographical <br />information system (GIS) to pipeline segments on the City map. The map color codes sewer <br />pipeline defect locations. The reviewer can select a specific pipeline for review and view <br />inspection and video data for selected segments. A City staff engineer will perform evaluation <br />and video review of all pipeline segments within a sewer basin and will document the City’s <br />decision to perform rehabilitation or replacement of pipeline segments within the meter basin. <br />Once all of the pipeline segments within a sewer basin are evaluated, the City will develop sewer <br />rehabilitation and replacement projects to address all segments selected for rehabilitation and <br />replacement within a sewer basin. Rehabilitation and replacement projects generally follow the <br />prioritization of sewer basins based on I/I factors listed and the PACP condition ratings. In some <br />cases, the schedule for larger rehabilitation and replacement projects are shifted based on <br />available funding. <br />Rehabilitation and replacement of sewer manholes is performed separately from sewer pipeline <br />rehabilitation and replacement. City staff perform a secondary inspection on all sewer manholes <br />6.2.A. - Page 41