My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-03-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-03-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:02:20 PM
Creation date
3/22/2018 4:45:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/26/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
931
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />City of Redwood City Page 32 <br />Sewer System Management Plan, March 2018 Element IV <br />crew will assess and report if the lateral needs to be repaired or replaced, and with what urgency. <br />Lateral CCTV inspections and findings are documented via Hiperweb work orders. Information <br />from these work orders is entered, compiled, and tracked in Hiperweb. Approximately four or <br />five laterals are repaired or replaced each week totaling 200 to 250 per year. <br />A copy of a door hanger that explains the City’s response to a service lateral request is included <br />in the Appendix IV-6. The door hanger is available in both English and Spanish, and can be used <br />to communicate follow-up instructions to the property owner if they are not available. <br />IV-8 Rehabilitation and Replacement Program <br />This section describes the City’s on-going process for identifying, prioritizing, and implementing <br />the sewer pipeline and lift station rehabilitation and replacement program. <br />IV-8.1 Sewer Pipeline and Manhole Inspection Condition Assessment <br />The City has implemented a multi-year program to perform CCTV inspection of all sewer <br />pipeline segments and visual inspection of all sewer manholes. The City performs CCTV <br />inspection utilizing a CCTV contractor. CCTV inspections are documented utilizing the National <br />Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program <br />(PACP) inspection ratings. Inspection data is collected and stored in WinCan V8, a <br />commercially available CCTV inspection software. The City maintains a master CCTV database <br />repository of all sewer pipeline inspections on the Departments shared network drive. Inspection <br />of the sewer system is performed by sewerage catchment basins and prioritized based on <br />inflow/infiltration factors documented in the August 2008 Redwood City Sanitary Sewer Master <br />Plan as updated in the 2013 Sewer Master Plan Revisions by West Yost shows the City’s sewer <br />basins Figure IV-3, which are the basis for selecting groups of sewer pipeline and manholes for <br />CCTV and visual inspection. <br /> <br /> <br />Figure IV-3: Redwood City Sewer Basins <br />The City has been performing a baseline inspection of all sewer pipeline and manholes over a <br />seven-year period. The inspection schedule for each meter basin is shown in Appendix IV-7. <br />5G <br />5H <br />5D <br />5E <br />7 <br />2 <br />DT2 <br />86 <br />5A <br />5F <br />3 <br />4 <br />5B <br />9 <br />5C <br />1 <br />RWS-WEST <br />RWS-NORTHWEST <br />RWS-EAST <br />RWS-CENTRALRWS-SOUTH <br />C04 <br />DT <br />SEAPORT <br />2009/2010 <br />2013/2014 <br />2008/2009 <br />2009/2010 <br />2013/2014 <br />2014/2015 <br />2012/2013 <br />2010/2011 <br />2011/2012 <br />2012/2013 <br />2011/2012 <br />2011/2012 <br />2007/2008 <br />2015/2016 <br />2012/2013 <br />2014/2015 <br />2015/2016 <br />RWS-WEST <br />RWS-NORTHWEST <br />RWS-NORTH <br />RWS-EAST <br />RWS-CENTRAL <br />RWS-SOUTH <br />6.2.A. - Page 40
The URL can be used to link to this page
Your browser does not support the video tag.