Redwood City Sanitary Sewer Master Plan Executive Summary <br /> FINAL <br /> <br />August 2008 5 <br />Recommended Capacity Improvement Program <br />The Capital Improvement Program (CIP) recommended in this study is designed to provide adequate <br />sewer system capacity for the City’s existing and anticipated future development. The total estimated <br />capital cost of the CIP is approximately $38 million, as shown in Table ES-1. These cost estimates <br />include baseline construction costs for gravity trunk sewers using open-cut and trenchless methods, lower <br />lateral replacement for remove-and-replace projects, and cost allowances for project mobilization and <br />demobilization, traffic control, and bypass pumping. An additional cost allowance for robust shoring of <br />trenches (e.g., interlocking sheet piles) was added for projects located near the San Francisco Bay, as <br />these projects are likely to be affected by poor (bay mud) soil conditions. The total estimated capital <br />costs also include a 30 percent allowance for contingencies for unknown conditions and an allowance of <br />30 percent of construction cost for engineering, administration, and legal costs. The estimated costs are <br />considered planning or conceptual level estimates and are considered to have an estimated accuracy range <br />of -30 to +50 percent, suitable for budget planning purposes. <br /> <br />Table ES-1 Capacity Projects and Costs, Ordered by Priority <br />Project <br />ID <br />Location Description Priority <br />Rank <br />Flow Conf. <br />Level <br />Cost <br />08b Manzanita St north of El Camino, <br />under railroad <br />1,700 feet of 18 inch pipe 1 1 $ 2,720,000 <br />11 El Camino Real, Maple St, Main St 3,300 feet of 15 inch pipe 1 1 $ 2,360,000 <br />07 Palm Ave between Kentfield Ave <br />and Hudson St <br />2,300 feet of 12 to 15 <br />inch pipe <br />1 2 $ 1,150,000 <br />10 James Ave, California St, Marshall <br />St, Jefferson Ave, Bradford St, <br />Walnut St <br />4,400 feet of 15 to 33 <br />inch pipe <br />1 2-3 $ 7,940,000 <br />05a Along Truman Ave to MacGarvey <br />Ave to Fairview Ave to Roosevelt <br />Ave, ending at Roosevelt Ave and <br />Junipero Ave <br />2,100 feet of 15 to 21 <br />inch pipe <br />2 2 $ 1,110,000 <br />12 Lincoln Ave, Beech St, Stambaugh <br />St, Walnut St, <br />5,700 feet of 27 to 30 <br />inch pipe <br />2 3 $ 4,910,000 <br />04 Brewster Ave between Clinton St <br />and Arch St <br />600 feet of 15 inch pipe 3 2 $ 330,000 <br />01 Edgewood Rd between Yorkshire <br />Ln and Alameda de las Pulgas <br />200 feet of 12 inch pipe 3 3 $ 90,000 <br />03 Winslow St from Whipple Ave to <br />Brewster St. Brewster St between <br />Winslow St and Veterans Blvd2 <br />2,000 feet of 18 inch pipe 3 3 $ 3,550,000 <br />06 Roosevelt Ave from Connecticut <br />Dr to Upton St2 <br />1,600 feet of 10 inch pipe 3 3 $ 680,000 <br />08a Adjacent to Woodside Rd, south of <br />El Camino Real <br />1,000 feet of 12 to 15 <br />inch pipe <br />3 3 $ 2,220,000 <br />08c Heller St from Manzanita to <br />Chestnut, Chestnut St to Broadway <br />3,400 feet of 18 to 21 <br />inch pipe <br />3 3 $ 3,200,000 <br />09 El Camino Real from Center St to <br />Manzanita St <br />1,300 feet of 10 inch pipe 3 3 $ 720,000 <br />05b Roosevelt Ave between Junipero <br />Ave and Hudson St <br />2,800 feet of 24 inch pipe 4 2 $ 1,690,000 <br />02 Whipple Ave between Arguello St <br />and Warren Ave <br />400 feet of 12 inch pipe 4 3 $ 190,000 <br />13 Walnut St to Maple PS 1,400 feet of 54 inch pipe 4 3 $ 4,950,000 <br />Total $37,810,000 <br />6.2.A. - Page 221