Laserfiche WebLink
City of Redwood City  December 30, 2013  <br />Sewer System Management Plan  <br />Record of Changes to the SSMP  <br />SSMP Element Description of Changes to SSMP Element Subsections Authorized <br />By <br />o Summary of use of SCADA system <br />o Description of lower lateral maintenance program <br />Element 4 – O&M <br />Program – <br />Condition <br />Assessment and <br />Rehabilitation <br />Planning <br />Significant update to narrative summary of condition <br />assessment and rehabilitation planning section <br />o Included new narrative summary of sewer pipeline and <br />manhole inspection program <br />o Included Figure 4-1 map of CCTV inspection priorities and <br />Table 4-1 inspection schedule for sewer basins <br />o Included a narrative of condition assessment, rehabilitation <br />planning, and prioritization process <br />Terence <br />Kyaw <br />Element 4 – O&M <br />Program - Funding <br />Updated narrative of Resources and Budget section to include <br />description of recent rate increases <br />Terence <br />Kyaw <br />Element 4 – O&M <br />Program - <br />Training <br />Updated narrative of training program summary describing <br />California Water Environment Association Collection System <br />Certification program <br />Included narrative summary of Sanitary Sewer Overflow <br />Emergency Response training <br />Terence <br />Kyaw <br />Element 5 – <br />Design and <br />Performance <br />Provisions <br />Included a link to the webpage to the City’s Engineering <br />Standards <br />Grace Le <br />Element 6 – <br />Emergency <br />Response Plan <br />Updated the Sanitary Sewer Overflow and Backup Response <br />Plan in February 2012 <br />All references to the Sanitary Sewer Overflow and Backup <br />Response Plan were updated to align with the latest version of <br />the document <br />The updated Sanitary Sewer Overflow and Backup Response <br />Plan is included as an attachment <br />Updated Sanitary Sewer Overflow and Backup Response Plan <br />in December 2013 due to changes in WDR specified in Order <br />No. 2006-0003-DWQ <br />Justin <br />Chapel <br />Element 7 – Fats, <br />Oils, and Grease <br />Control Program <br />Updated the Public Education and Outreach section to include <br />descriptions of outreach materials included on the City’s <br />website along with links to associated webpages <br />Included a new subsection to summarize Grease Removal <br />Device Installation Requirements. <br />Significant update to the narrative summary of the Commercial <br />Source Control Inspection Program <br />Terence <br />Kyaw <br />Element 8 – <br />System Evaluation <br />and Capacity <br />Assurance Plan <br />The City performed a Sewer Master Plan Update in January <br />2013. The Sewer Master Plan Update is included as an <br />attachment to the SSMP. <br />Updated the narrative description of the System Evaluation and <br />Capacity Assurance Plan to reference the new Sewer Master <br />Plan Update. <br />Grace Le <br />Element 9 – Updated narrative of annual reporting and use of the annual Terence <br />6.2.A. - Page 236