My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-08-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:46 PM
Creation date
8/8/2002 3:10:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Protession l <br />c eeCare <br /> mpany <br /> A Division of Arboficultural Specialties, Inc. <br /> <br /> June 28, 2002 <br /> <br /> Bob Mullen <br /> City of Redwood City <br /> 1400 Broadway <br /> Redwood City, CA 94063-0319 <br /> <br /> Deer Bob, <br /> We've talked about using a tree injection system in lieu of spraying your trees. The cost would <br /> be $6.00 per injection calculated on the diameter of each tree. The injections should be spaced <br /> approximately eight (8) inches apart around the tree. For example: <br /> A 12 inch diameter tree would need 5 injections (2x3.14x6)/8 = 4.71 5 @ $6.00 = $30.00 <br /> A 24 inch diameter tree would need 10 injections (2x3.14x12)/8 -- 9.42 10 @ $6.00 -- $60.00 <br /> Let me know if you are interested in starting this process. <br /> <br /> p() Box 2559. Bc!'keb~. CA c)~702. (5 I(}) 549-3954 Fax (5101549-3965 · ISA Certified Arborist .~938. Contractor's L~cense #676952 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.