My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC18-05 0019 PC Reso Recommending Approval of General Plan - 851 Main St.
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2018
>
Reso PC18-05 0019 PC Reso Recommending Approval of General Plan - 851 Main St.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 9:05:42 AM
Creation date
4/2/2018 1:23:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/20/2018
Text box
ID:
1
Creator:
Created:
4/2/2018 1:24 PM
Modified:
4/2/2018 1:24 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
Created:
4/2/2018 1:24 PM
Modified:
4/2/2018 1:24 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
41. Backflow Protection - Backflow protection on all water services is required. The <br />backflow preventer shall be above grade and located on private property, accessible to <br />the Public Works division for testing. [COA] [ENGINEERING] <br />42. Fire Flow - The Project shall meet fire flow requirements as established by the Fire <br />Department which are based on the Fire Code. Fire flow tests are typically performed <br />during the preliminary design phase but must be completed prior to submittal of final <br />design. Applicant shall contact the Fire Department for fire flow requirements, and then <br />submit a written fire flow test request to Engineering. [COA] [ENGINEERING] <br />43. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal <br />Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo <br />County C.3 Stormwater Technical Guidance. [SDR] [ENGINEERING] <br />a. Treatment Controls - Treatment measures to be shown on final <br />improvement or grading plans shall not differ materially from the treatment <br />measures presented on the project's Tentative Parcel Map, approved on <br />without written approval from the Engineering Department. <br />b. Treatment Measure Inspection - Applicant shall coordinate installation of <br />stormwater treatment measures with the municipality, shall arrange to have <br />the City's designated inspector present at the time of installation, and shall <br />have the City's designated inspector complete a final inspection of installed <br />stormwater treatment measure immediately after installation is complete. <br />44. Stormwater Management Plan (SWMP) - Applicant shall prepare a SWMP that <br />includes, at a minimum, exhibit(s) showing drainage areas and location of Low Impact <br />Development (LID) treatment measures; total project site area and total area of land <br />disturbed; total new and/or replaced impervious area; treatment measures and <br />hydraulic sizing calculations; a listing of source control and site design measures to be <br />implemented at the site; saturated hydraulic conductivity rate(s) at relevant locations <br />or hydrologic soil type (A, B, C or D) and source of information; elevation of high <br />seasonal groundwater table; and a brief summary of how the project is complying with <br />Provision C.3 of the MRP. [COA] [ENGINEERING] <br />45. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP <br />plan sheets are available electronically for inserting into project plans. <br />[SDR] [ENGINEERING] <br />Street Infrastructure Improvements <br />46. Streetlights - A new streetlight shall be installed, if needed, as determined by the City <br />Engineer. The style and location of all streetlights shall be as determined by the City <br />Landscape Architect. [SDR] [ENGINEERING] <br />ATTY/RESO.0019/PC RESO RECOMMENDING APPROVAL OF GENERAL PLAN — 851 MAIN STREET <br />REV: 03-15-18 PR <br />Page 9 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.