Laserfiche WebLink
47. Repair or Replace Street Infrastructure - Restore streets surrounding the project <br />site to the satisfaction of the City Engineer at project completion. When this requires <br />additional pavement restoration, the City Engineer shall approve the preferred layout <br />of pavement markings. [SDR] [ENGINEERING] <br />48. Reconstruction of Frontage Streets - The City has identified the need for street <br />reconstruction along Walnut street fronting the project site, including a minimum of a <br />2" grind and overlay for the project frontage. Additional reconstruction may be <br />required if the construction of the project adversely affects the existing pavement. <br />[SDR] [ENGINEERING] <br />49. Parking Garage Ramps - Parking garage ramps shall meet the Design Criteria of the <br />Engineering Standards and consider safety and visibility of pedestrians to the <br />satisfaction of the City Engineer. Access controls shall be designed and placed in such <br />a way that vehicles do not block the public sidewalk or queue in the public right-of-way. <br />The access control system shall be delineated in the building permit submittal. Person <br />doors with panic hardware and alarms shall be installed at or adjacent to gates between <br />private and public parking to allow the safest emergency egress path of travel. <br />[SDR] [ENGINEERING] <br />50. Parking Data & Signage - The project shall collect (utilizing sensors, loop detectors, <br />or equivalent technology) and make publicly available, real-time garage occupancy <br />data (via a parking app or other means deemed appropriate by the City and a sign at <br />the garage entrance). [CCA] [ENGINEERING] <br />51. Shoring for Excavations -No tiebacks shall extend into the public right of way or onto <br />adjacent properties without the written agreement of the City and/or private property <br />owner. Any tie -backs within the City's right of way shall be de -tensioned prior to <br />permit sign -off and/or project acceptance. [COA] [ENGINEERING] <br />Construction -Related Activities <br />52. Pre -Construction Meeting - After City permits are approved, but prior to start of <br />construction, hold a preconstruction conference with Engineering and Building staff <br />and other interested parties. The developer shall arrange for the attendance of the <br />construction manager, contractor, and all subcontractors who are responsible for <br />grading and erosion and sedimentation protection controls. [COA] [ENGINEERING] <br />53. Construction Management and Staging - Prior to encroachment permit issuance, <br />submit a construction parking management plan, which shall outline the number of <br />construction workers by phase, phase duration, where parking will be located for each <br />phase. Construction parking, material storage, equipment, or other construction - <br />related uses are not allowed within the City right of way without prior approval from <br />the City Engineer. [COA] [ENGINEERING] <br />ATTY/RESO.0019/PC RESO RECOMMENDING APPROVAL OF GENERAL PLAN — 851 MAIN STREET <br />REV: 03-15-18 PR <br />Page 10 of 16 <br />