Laserfiche WebLink
EXHIBIT A <br />1. Scone of Work/ Tasks <br />Contractor will perform scheduled annual preventive maintenance, full testing, and <br />replacement/repair services on boiler equipment listed below in the City facilities listed below in <br />accordance with the services described below within three years of the Effective Date. <br />Facility <br />Address <br />Equipment <br />Model <br />Serial <br />Manufacturer <br />Number <br />Police Facility <br />1301 Maple <br />Rite <br />200 <br />23165 <br />City Hall <br />1017 Middlefield <br />Laars <br />PH1200EN <br />C97AO0789 <br />Main Library <br />1044 Middlefield <br />Laars <br />PNCH1750NACL2CXN <br />C09216819 <br />Red Morton <br />1120 Roosevelt <br />Ajax <br />WGN-850 <br />46947 <br />Community Center <br />Public Works Services <br />1400 Broadway <br />Rite <br />10555 <br />24781 <br />(MSC) <br />Redwood Shores <br />399 Marine <br />Camus <br />DFNH 1102 <br />110705969 <br />Library <br />Parkway <br />• Open, clean and vacuum fireside of boiler with City's power equipment, clean furnace, <br />and wire brush tube sheet (when applicable/accessible). <br />• Open and clean low water cut-off assemblies. Flush and reseal waterside (when <br />applicable/accessible). <br />• Vacuum breeching in immediate vicinity of boiler, where applicable. <br />• Inspect refractory, point up and wash coat all refractory (when applicable/accessible). <br />• Seal and close fireside of boiler. <br />• Install new gaskets. <br />• Remove and inspect main bumer (if applicable/accessible) and gas pilot assembly, <br />and adjust ignition electrode if required. <br />• Reinstall main burner (if applicable) and gas pilot assembly in accordance with recommended <br />specification and tolerance. <br />• Check flame failure safeguard control for pilot and main flame ignition. <br />• Check operation of blower motor and control circuitry. <br />• Check operation and adjust all linkages, belts and pulleys in accordance with factory <br />specifications. <br />• Check operation of gas valves and vent valves, including all gas train components. <br />• Check operation of all boiler -operating controls, limit pressuretrols and running interlocks. <br />• Check operation of low water controls on hot water closed systems. Draw down water <br />column and check low water controls and/or feed water pump control on steam systems. <br />• Check burner and check pilot and main flame ignition system. <br />• Check and calibrate each boiler/bumer for optimum air/fuel mixture for natural gas, and <br />fine-tune and adjust firing to its maximum efficiency level throughout entire <br />modulation range. Analyze flue gas and monitor temperature, 02, CO2, CO and <br />excess air (worn control, metering, linkage or affiliated equipment replacements, if <br />required, is not included but will be made available at 15% discount on parts). <br />REV: 03.12-18 MI <br />Page 6 of 8 <br />ATTY/AGR.2018.050/R. F. MacDonald Co. <br />