My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />CCTV PROGRAM (75583) <br />SEWER <br /> <br />PROJECT DESCRIPTION <br />Selected sanitary sewer basins throughout the City will be cleaned and <br />closed‐circuit television (CCTV) inspected. The CCTV inspection service <br />provides data required to assess the condition of the sanitary sewer <br />lines. A determination on the repair and replacement is made for <br />individual segments of the sanitary sewer collection system so that the <br />pipeline can be included with the annual sanitary sewer capital <br />improvement project. <br />LOCATION DESCRIPTION: <br />Citywide <br />PROJECT BENEFITS <br /> Data provided by the CCTV inspection allows staff to assess the condition of the existing sanitary sewer pipe <br />segments. <br />PROJECT STATUS <br />The entire gravity sewer mains in Redwood Shores is currently being closed circuit televised (CCTV) and cleaned by National <br />Plant Services and to date, is 80% complete; previously completed CCTV report and videos in Basins DT2 and 5G is currently <br />being reviewed by City staff and to date, is 90% complete. Review of additional sewer basin areas in Pacific Shores and <br />Downtown are to be planned. <br />PROJECT SCHEDULE <br />This is an ongoing program. <br /> <br /> <br /> <br />PROJECT ESTIMATES <br /> BALANCE REQUESTED BUDGET 5 – Year Future <br />FUND As of 04/2018 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />689 $348,175 $400,000 $400,000 $400,000 $400,000 $400,000 $2,000,000 $400k/yr <br /> <br />Total $400,000 $400,000 $400,000 $400,000 $400,000 $2,000,000 <br /> <br />9.A - Page 78
The URL can be used to link to this page
Your browser does not support the video tag.