Laserfiche WebLink
  <br />  <br />  <br />COLLECTION SYSTEM REPLACE. PROG. (75133)  <br />SEWER  <br />  <br />PROJECT DESCRIPTION  <br />The City systematically replaces and/or rehabilitates sections of aging  <br />sewer infrastructure to ensure the continued reliability of the  <br />system.  The Sanitary Sewer Master Plan identifies sewer trunk mains  <br />that need to be increased in size to improve the capacity and  <br />reliability of the sewer collection system. Also, staff identifies  <br />pipelines that required excessive maintenance or experienced  <br />repeated service disruptions to identify pipelines for improvement.  <br />LOCATION DESCRIPTION:  <br />Citywide  <br />PROJECT BENEFITS  <br /> Improves the condition and reliability of the sewer collection system by minimizing infiltration and inflow.   <br /> Upsizes sanitary sewer mains to increase capacity to the sewer collection system.  <br />PROJECT STATUS  <br />The "2016‐2017 Sanitary Sewer and Watermain Replacement Project", which covers areas in Basins 6 and 7 and Trident Ave  <br />in Redwood Shores, has been awarded to Casey Construction and to date, construction is 50% complete. Construction is  <br />expected to be completed in Spring of 2018; the proposed "2017‐2018 Sanitary Sewer Replacement Project”, which will  <br />cover Basins 5A and 5D, is currently in design in‐house and to date, is 80% complete. The project will be bid in the Spring of  <br />2018.  <br />PROJECT SCHEDULE  <br />This is an ongoing program.  <br />   <br />           <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />689  $5,778,587    $3,878,915   $6,000,000  $6,000,000  $6,000,000  $6,500,000   $28,378,915  $6.5M/yr <br />       <br />Total      $3,878,915   $6,000,000  $6,000,000  $6,000,000  $6,500,000   $28,378,915  <br />  <br />9.A - Page 79