Laserfiche WebLink
  <br />  <br />  <br />REDWOOD STORM DRAIN‐CREEKS & CHANNELS  <br /> (70523)  <br />STORMWATER  <br />  <br />PROJECT DESCRIPTION  <br />The Redwood Creek Improvements Project involves repairing,  <br />rehabilitating and replacing the concrete lined portions of the  <br />Redwood Creek and its tributary branches.  Works involves replacing  <br />trapezoidal channel walls, rectangular channel walls and creek base  <br />slabs.  Work also involves repairing concrete deficiencies such as  <br />spalling and cracking and corrosion of the reinforcement steel.  <br />PROJECT BENEFITS  <br /> The project improvements will help ensure continued reliability of the storm drain system.  <br />PROJECT STATUS  <br />The design of the 2017‐2018 Redwood Creek Improvements Project (Jefferson Branch and Redwood Branch) were finalized.   <br />The project for the Jefferson Branch of Redwood Creek is scheduled for bidding on Spring 2018.    <br />  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />04/2018    07/2018  08/2018    07/2019 08/2019    03/2020 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br />  <br />2018/19 2019/20 2020/21 2021/22 2022/23  <br />Total Years <br />357  ($21,616)    $0  $3,500,000 $3,000,000 $3,000,000 $3,000,000  $12,500,000 <br />       <br />Total      $0  $3,500,000 $3,000,000 $3,000,000 $3,000,000  $12,500,000 <br />  <br />9.A - Page 91