Laserfiche WebLink
  <br />  <br />  <br />STORM DRAIN COLL. SYSTEM CONSTRUCTION (70503)  <br />STORMWATER  <br />  <br />PROJECT DESCRIPTION  <br />Replaces and/or rehabilitates sections of aging storm infrastructure to  <br />ensure the continued reliability of the system.  The Storm Drain Master  <br />Plan identifies storm drain mains that need to be upgraded to improve the  <br />capacity and reliability of the storm drain system.   <br />  <br />   <br />LOCATION DESCRIPTION:  <br />Citywide  <br />PROJECT BENEFITS  <br /> Improves the condition and reliability of the storm drain system by minimizing infiltration and inflow.   <br /> Upsizes storm drain mains to increase capacity to the storm drain system.  <br />PROJECT STATUS  <br />The 2017‐2018 Redwood Creek Improvements Project (Jefferson Branch) is schedule for bidding on March 2018. <br />  <br />PROJECT SCHEDULE  <br />This is an ongoing program.  <br />Planning Design Construction <br />04/2018    07/2018  08/2018 05/2019 06/2019    03/2020 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of 04/2018  2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357  $1,526,536    $0  $0 $0 $0 $0  $0  <br />      <br />Total          <br />  <br />   <br />9.A - Page 92