My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />STORMWATER PUMP STATIONS REHABILITATION PROGRAM <br />(83171) <br />STORMWATER <br /> <br />PROJECT DESCRIPTION <br />Improve existing storm drain pump stations and storm pipelines. <br />Proposed improvements will increase the efficiency, safety, and <br />lifespan of the pump stations. Improvements include new submersible <br />pumps with more horsepower, new variable speed drive controls to <br />increase the efficiency of the pumps, new standby engine generator, <br />pipes replacement and rehabilitation of the wet well surface, new <br />valve vault, pipes and other appurtenances replacement. <br />LOCATION DESCRIPTION: <br />Citywide <br />PROJECT BENEFITS <br /> Improvements increase the efficiency, safety, and lifespan of the pump stations. <br />PROJECT STATUS <br />Issued a request for proposals for the rehabilitation/improvements of the individual storm drain pump station. Preliminary <br />design complete. Waiting on funding to complete design. <br />PROJECT SCHEDULE <br /> <br />Planning Design Construction <br />04/2018 07/2018 08/2018 05/2019 06/2019 03/2020 <br /> <br />PROJECT ESTIMATES <br /> BALANCE REQUESTED BUDGET 5 – Year Future <br />FUND As of <br />04/2018 <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357 $476,893 $0 $900,000 $6,800,000 $5,700,000 $4,100,000 $17,500,000 <br /> <br />Total $0 $900,000 $6,800,000 $5,700,000 $4,100,000 $17,500,000 <br /> <br />9.A - Page 93
The URL can be used to link to this page
Your browser does not support the video tag.