Laserfiche WebLink
  <br />  <br />  <br />STORMWATER PUMP STATIONS REHABILITATION PROGRAM  <br />(83171)  <br />STORMWATER  <br />  <br />PROJECT DESCRIPTION  <br />Improve existing storm drain pump stations and storm pipelines.  <br />Proposed improvements will increase the efficiency, safety, and  <br />lifespan of the pump stations. Improvements include new submersible  <br />pumps with more horsepower, new variable speed drive controls to  <br />increase the efficiency of the pumps, new standby engine generator,  <br />pipes replacement and rehabilitation of the wet well surface, new  <br />valve vault, pipes and other appurtenances replacement.  <br />LOCATION DESCRIPTION:  <br />Citywide  <br />PROJECT BENEFITS  <br /> Improvements increase the efficiency, safety, and lifespan of the pump stations.  <br />PROJECT STATUS  <br />Issued a request for proposals for the rehabilitation/improvements of the individual storm drain pump station.  Preliminary  <br />design complete.  Waiting on funding to complete design.  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />04/2018    07/2018  08/2018    05/2019 06/2019    03/2020 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357  $476,893    $0  $900,000 $6,800,000 $5,700,000 $4,100,000  $17,500,000 <br />      <br />Total      $0  $900,000 $6,800,000 $5,700,000 $4,100,000  $17,500,000 <br />   <br />9.A - Page 93