Laserfiche WebLink
  <br />  <br />  <br />STORMWATER SYSTEM CAPACITY ASSESSMENT (83168)  <br />STORMWATER  <br />PROJECT DESCRIPTION  <br />The work consists of assessing the drainage facilities and to help guide  <br />policy, design standards, and Capital Improvements plans for system  <br />upgrades. Evaluates the City watershed areas, the Eastern Low Lying  <br />Areas, all storm drain pump stations and other related storm drain  <br />structures.   <br />  <br />  <br />LOCATION DESCRIPTION:  <br />Citywide  <br />PROJECT BENEFITS  <br /> Will be able to analyze the existing deficiencies of flood control facilities of the system.    <br /> Will be able to determine the improvements required in order to eliminate street flooding in the 10 year, the 30  <br />year and 100 year storm event.  <br />PROJECT STATUS  <br />Completed the Eastern Low‐Lying Area Storm Drainage Master Plan.   <br />  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Planning <br />04/2018    07/2018  08/2018 07/2019 08/2019    03/2019 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357  $295,633     $0 $0 $0 $0 $750,000  $750,000 <br />     <br />Total       $0 $0 $0 $0 $750,000  $750,000 <br />  <br />9.A - Page 94