My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-07 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-07 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 9:26:27 AM
Creation date
5/3/2018 4:24:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR – 1548 MAPLE <br />REV: 04-30-18 PR <br />Page 4 of 49 <br />EXHIBIT A <br />CEQA Findings of Fact <br /> <br />The following findings, including impact statements, mitigation measures, findings, and facts <br />in support of findings, are based on the full administrative record including but not limited to <br />the FEIR which contains a greater discussion of each issue. Pursuant to CEQA Guidelines <br />Section 15091(a)(1), the mitigation measures will be required in the project and avoid or <br />substantially lessen the significant environmental effects identified in the final EIR, as <br />described herein. <br /> <br />BIOLOGICAL RESOURCES <br />Impact BIO-1: Construction of the proposed project and the project variant could result <br />in impacts to nesting white-tailed kites and other native birds protected under the federal <br />Migratory Bird Treaty Act and California Fish and Game Code. <br />Mitigation BIO-1: To the extent feasible, initial grading and vegetation removal <br />activities shall occur during the non-nesting season (September 1 to January 31). For any <br />construction activities conducted during the nesting season, a qualified biologist (i.e., <br />experienced in searching for passerine nests) shall conduct a preconstruction nest survey of <br />all trees or other suitable nesting habitat in and within 250 feet of the limits of construction <br />activities. The survey shall be conducted no more than two days prior to the start of work. If <br />the survey indicates the presence of nesting birds, the biologist shall determine an <br />appropriately sized buffer around the nest in which no work shall occur until the young have <br />successfully fledged. The size of the nest buffer shall be determined by the biologist and shall <br />be based on the nesting species and its sensitivity to disturbance. In general, buffer sizes of <br />up to 250 feet for raptors and 50 feet for other birds should suffice to prevent substantial <br />disturbance to nesting birds, but these buffers may be increased or decreased, as appropriate, <br />depending on the bird species and the level of disturbance anticipated near the nest. <br />Finding: Implementation of Mitigation Measure BIO-1 would reduce the project- <br />related impact to nesting white-tailed kites and other native birds protected under the federal <br />Migratory Bird Treaty Act and California Fish and Game Code to a less-than-significant level. <br />Facts in Support of Finding: This mitigation measure appropriately identifies the <br />nesting and non-nesting seasons, and spells out a process for conducting initial grading and <br />vegetation removal activities if they were to be conducted during the nesting season. <br /> <br />Impact BIO-2: Construction of the proposed project and the project variant could result <br />in impacts to longfin smelt, a special-status species, and other native fish species. <br />Mitigations BIO-2a: If it is necessary to work below the ordinary high water mark or <br />mean high tide line within Redwood Creek, the work shall be restricted to the period between <br />August 1 and November 30 when longfin smelt are unlikely to be present. If it is not practicable <br />to conduct the in-water work within this timeframe, the applicant shall obtain an Incidental <br />Take Permit from California Department of Fish and Wildlife (CDFW) prior to initiation of in- <br />water work, which typically specifies avoidance, minimization, and compensation measures <br />to reduce effects to a less than significant level. <br />BIO-2b: For any dewatering that could occur during the construction period, all <br />discharge water shall be pumped into a temporary siltation pond/desilting basin, Baker tank, <br />7.A. - Page 41
The URL can be used to link to this page
Your browser does not support the video tag.