Laserfiche WebLink
<br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR – 1548 MAPLE <br />REV: 04-30-18 PR <br />Page 11 of 49 <br />Mitigation TRA-3: Additional capacity along the Woodside Road corridor shall be <br />added and improvements to the US 101/SR 84 interchange shall be made pursuant to the US <br />101/SR 84 Interchange Improvement Project. The project applicant shall contribute its fair <br />share contribution to the improvements. Concurrent with future building permit applications, <br />the City shall ensure that the required fair-share payment has been submitted. <br />Finding: Implementation of Mitigation Measure TRA-3 would reduce project-related <br />and cumulative impacts to vehicle delay at Intersection #6 to a less-than-significant level. <br />Facts in Support of Finding: This mitigation measure appropriately identifies fair share <br />contributions by the project applicant to assist in the addition of capacity along the Woodside <br />Road corridor and improvement to the US 101/SR 84 interchange, pursuant to the US <br />101/SR 84 Interchange Improvement Project. <br /> <br />Impact TRA-4: Development of the proposed project and the project variant, <br />combined with cumulative development in the defined geographic area, including past, <br />present, existing, approved, pending, and reasonably foreseeable future development, would <br />contribute a considerable amount of traffic to Blomquist Street/Seaport Boulevard/East <br />Bayshore Road (Intersection #8) and increase the delay by more than the five seconds in the <br />PM peak hour. <br />Mitigation TRA-4: The existing right-of-way shall be restriped to add a second <br />westbound left turn pocket on East Bayshore Road and to extend the existing turn pockets. <br />This modification is included in the TIF project list. The project applicant shall contribute its <br />fair share to this improvement. Concurrent with future building permit applications, the City <br />shall ensure that the required transportation impact mitigation fee has been submitted. <br />Finding: Implementation of Mitigation Measure TRA-4 would reduce project-related <br />and cumulative impacts related to the addition of a considerable amount of traffic to <br />Intersection #8 and an increase in vehicle delay by more than five seconds to a less-than- <br />significant level. <br />Facts in Support of Finding: This mitigation measure appropriately identifies fair <br />share payment by the project applicant to add a second westbound left turn pocket on East <br />Bayshore Road and to extend the existing turn pockets, which are modifications included in <br />the TIF project list. <br /> <br />AIR QUALITY <br />Impact AIR -1: Construction of the proposed project and the project variant would <br />generate air pollutant emissions that could violate air quality standards. <br />Mitigation AIR-1: Consistent with guidance from the BAAQMD, the project contractor <br />shall ensure the following Basic Construction Mitigation Measures are implemented through <br />all construction contracts and specifications for the project: <br />• All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and <br />unpaved access roads) shall be watered two times per day. <br />• All haul trucks transporting soil, sand, or other loose material off-site shall be covered. <br />7.A. - Page 48