My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-07 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-07 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 9:26:27 AM
Creation date
5/3/2018 4:24:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br /> <br /> <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR – 1548 MAPLE <br />REV: 04-30-18 PR <br />Page 37 of 49 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measures <br />Timeframe for <br />Implementation <br />Responsibility for <br />Implementation <br />Oversight of <br />Implementation <br />AIR-1 Continued • Idling times shall be minimized either by shutting <br />equipment off when not in use or reducing the <br />maximum idling time to 5 minutes (as required by the <br />California airborne toxics control measure Title 13, <br />Section 2485 of California Code of Regulations [CCR]). <br />Clear signage shall be provided for construction <br />workers at all access points. <br />• All construction equipment shall be maintained and <br />properly tuned in accordance with manufacturer's <br />specifications. All equipment shall be checked by a <br />certified mechanic and determined to be running in <br />proper condition prior to operation. <br />• A publicly visible sign shall be posted with the <br />telephone number and person to contact at the City of <br />Redwood City regarding dust complaints. This person <br />shall respond and take corrective action within 48 hours. <br />The BAAQMD phone number shall also be visible to <br />ensure compliance with applicable regulations. <br /> <br />AIR-2: Operation of the <br />proposed project would expose <br />future residents of the project <br />site to toxic air contaminants. <br />AIR-2: The following measures shall be implemented by <br />the project applicant and approved by the City through the <br />final design process to reduce TACs and particulate matter <br />indoors to a level sufficient to achieve compliance with <br />BAAQMD health risk thresholds: <br />• The project applicant shall provide an HVAC system <br />with a control efficiency sufficient to result in a <br />reduction of a minimum 80.0 percent of particulates of <br />2.5 microns or less, such as Minimum Efficiency <br />Reporting Value (MERV)-13 filters or greater, for <br />indoor air filtration systems . The ventilation system <br />shall be certified to achieve the stated performance <br />effectiveness from indoor areas. <br />• The project applicant shall locate all air intakes as far <br />away from US 101 as feasible. <br />Prior to issuance <br />of building <br />permits <br />Project Applicant Redwood City <br />Community <br />Development <br />Director 7.A. - Page 74
The URL can be used to link to this page
Your browser does not support the video tag.