My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-07 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-07 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 9:26:27 AM
Creation date
5/3/2018 4:24:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 16 of 19 <br />ATTY/RESO.0033/CC RESO 1548 MAPLE APPROVING PROJECT PERMITS <br />REV: 04-30-18 PR <br />64. Premises Identification (Address Numbers) - Indicate on the plans where the premises identification (address) will be located and the size (minimum 12") in a contrasting background facing the street from which the building takes the address CFC 505. 65. Portable Fire Extinguishers Required - Portable fire extinguishers, with a minimum classification of 2A:10B C are required to be permanently installed in all buildings in the common areas within 50 feet of travel from all portions of the building in compliance with NFPA 10 and CFC 906. 66. As the proposed structure exceeds 30 feet in height, at least two means of fire apparatus access shall be provided CFC D104.1. 67. As the proposed structure exceeds 62,000 square feet in area, two separate and approved fire apparatus access roads are required CFC D J 04.2. 68. The width of the required fire apparatus access roads shall be a minimum of 26 feet to accommodate aerial apparatus D105.2. 69. Any fire apparatus access roads in excess of 150 feet shall have fire apparatus turn- around s installed as per 2016 CFC Table D103.I. Construction-Related Activities 69. Verification for Dimensions – All dimensions, including building location on the site, setbacks, building height, etc. shall be verified by a licensed surveyor. A survey report shall be provided to the Building Inspector for review and approval. [COA][BUILDING] 70. Sales and Use Taxes – Applicant shall use good faith efforts to register with the Board of Equalization to create an ID prior to project construction and operation. This maximizes the City’s allocation of sales and use taxes associated with project construction. Contact Nancy Murguia, Finance Department, at (650) 780-7097 or nmurguia@redwoodcity.org. [COA][FINANCE] 71. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] 72. Construction Sign - Prior to the start of any construction work, including demolition, install at least one 36” x 48” (minimum) construction sign in a visible location along the project frontage for the duration of construction. The sign shall include, at minimum, the following information: project name & address, elevation or rendering, construction manager (name, phone number), anticipated completion (season, year), and the City’s permitting website http://permits.redwoodcity.org [COA][PLANNING] <br />7.A. - Page 201
The URL can be used to link to this page
Your browser does not support the video tag.