My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 BKF Engineers and San Ca
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Under $60K
>
Agmt05 BKF Engineers and San Ca
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2005 5:07:36 PM
Creation date
12/15/2005 5:04:48 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers and City of, San Carlos
PROJECT NAME
pro services
RMP File Number
304.5
Date
12/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Parviz Mokhtari <br />Mr. Jon Lynch <br />Cordilleras Creek Studies <br />November 22, 2005 <br />Page 2 of 4 <br /> <br />SCOPE OF SERVICE <br /> <br />Task 1. <br /> <br />Collect Data <br /> <br />BKF will collect infonnation to identify constraints. The City-wide GIS <br />survey infonnation developed by Towell will be used as background. BKF <br />will meet once with the Cities to detennine key concerns and establish the <br />design criteria. BKF will provide field measurements of the approximate <br />Creek flow line and flow width at the flow line. <br /> <br />Task 2. <br /> <br />Site Survey <br /> <br />No site survey is proposed as a part ofthis work. BKF will utilize available <br />survey infonnation, including the GIS maps, surveyed cross sections from <br />previous Creek studies, and the field measurements from Task 1. <br /> <br />Task 3. <br /> <br />Sediment Volumes <br /> <br />BKF will evaluate sediment to be removed from the various reaches of the <br />Creek. The proposed flow line will be taken from Figure 02P of the City of <br />San Carlos Flood Insurance Study dated September 1977. <br /> <br />Task 4. <br /> <br />Maintenance Specifications <br /> <br />BKF will prepare maintenance specifications for removal of sediment from <br />the Creek during the period from April 15 to October 1. BKF will discuss <br />alternatives with contractors and will meet at the site with two contractors to <br />have alternative biddable concepts for Creek clearing. <br /> <br />Task 5. <br /> <br />Preliminary Pennitting Review <br /> <br />BKF will contact environmental agencies to obtain preliminary input on Creek <br />sediment removal constraints, including the selected concepts. <br /> <br />Task 6. <br /> <br />Permit-Level Construction Documents <br /> <br />BKF will prepare permit-level Construction Documents for the removal of <br />sediment from the channel bottom suitable for use in obtaining a maintenance <br />permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.