My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Facts in Support of Findina: This mitigation measure identifies the process for the <br />preparation and approval of construction management plan that would include best <br />management practices that would be required to be included for reducing impacts to <br />vehicular, bicycle, pedestrian, and transit circulation. <br />Impact TRA -3: Development of the proposed project and the project variant, <br />combined with cumulative development in the defined geographic area, including past, <br />present, existing, approved, pending, and reasonably foreseeable future development, <br />would contribute a considerable amount of traffic and increase the average vehicle delay by <br />more than the five seconds at Broadway/Woodside Road/US 101 Southbound Off -Ramp <br />(Intersection #6) during the AM peak hour. <br />Mitigation TRA -3: Additional capacity along the Woodside Road corridor shall be <br />added and improvements to the US 101/SR 84 interchange shall be made pursuant to the <br />US 101/SR 84 Interchange Improvement Project. The project applicant shall contribute its <br />fair share contribution to the improvements. Concurrent with future building permit <br />applications, the City shall ensure that the required fair -share payment has been submitted. <br />Finding: Implementation of Mitigation Measure TRA -3 would reduce project -related <br />and cumulative impacts to vehicle delay at Intersection #6 to a less -than -significant level. <br />Facts in Support of Finding: This mitigation measure appropriately identifies fair share <br />contributions by the project applicant to assist in the addition of capacity along the Woodside <br />Road corridor and improvement to the US 101/SR 84 interchange, pursuant to the US <br />101/SR 84 Interchange Improvement Project. <br />Impact TRA -4: Development of the proposed project and the project variant, <br />combined with cumulative development in the defined geographic area, including past, <br />present, existing, approved, pending, and reasonably foreseeable future development, <br />would contribute a considerable amount of traffic to Blomquist Street/Seaport <br />Boulevard/East Bayshore Road (Intersection #8) and increase the delay by more than the <br />five seconds in the PM peak hour. <br />Mitigation TRA -4: The existing right-of-way shall be restriped to add a second <br />westbound left turn pocket on East Bayshore Road and to extend the existing turn pockets. <br />This modification is included in the TIF project list. The project applicant shall contribute its <br />fair share to this improvement. Concurrent with future building permit applications, the City <br />shall ensure that the required transportation impact mitigation fee has been submitted. <br />Finding: Implementation of Mitigation Measure TRA -4 would reduce project -related <br />and cumulative impacts related to the addition of a considerable amount of traffic to <br />Intersection #8 and an increase in vehicle delay by more than five seconds to a less -than - <br />significant level. <br />AT FY/RESO.0035/CC RESO CERTIFYING FINAL EIR —1548 MAPLE RESO. NO. 15661 <br />REV: 04-30-18 PR MUFF NO. 601 <br />Page 11 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.