My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact <br />Mitigation Measures <br />site, with the exception of authorized law enforcement <br />personnel. <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for <br />Implementation Implementation <br />of construction <br />BI0-3c: All food -related trash that may attract predators and During all phases Project Applicant <br />vermin shall be properly contained and removed from the of construction <br />work site daily. <br />BI0-3d: All refueling, maintenance, and staging of <br />During all phases <br />equipment and vehicles shall occur at least 100 feet from <br />of construction <br />the top of bank of Redwood Creek. Secondary containment <br />shall be used during refueling. A spill prevention plan shall <br />be in place prior to the initiation of demolition or construction <br />activities. <br />BI0-3e: All vehicles and equipment shall be maintained in <br />During all phases <br />good working condition and free of leaks. <br />of construction <br />BI0-3f: Standard Best Management Practices (BMPs) shall During all phases <br />be employed to avoid degradation of aquatic habitat by of construction <br />maintaining water quality and controlling erosion and <br />sedimentation during construction as required by <br />compliance with the General National Pollution Discharge <br />Elimination System Permit for Construction Activities. <br />BMPs shall include, but not be limited to, installation of silt <br />fencing and erosion control wattles between Redwood <br />Creek and construction activities. <br />BIO -3e: To prevent the entanglement of wildlife, no During all phases <br />erosion control devices containing plastic monofilament of construction <br />netting shall be used or stored on site. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 28 of 49 <br />RE50. NO. 15661 <br />MUFF NO. 601 <br />Project Applicant <br />Project Applicant <br />Project Applicant <br />Project Applicant <br />Oversight of <br />Implementation <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.