My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measures <br />CUL -2 Continued CUL -2b: All ground disturbance activities at the project site <br />shall be monitored by an archaeologist that meets the <br />Secretary of the Interior's Professional Qualifications <br />Standards for Historic Archaeology. Monitoring shall <br />continue at this location until the archaeologist determines <br />that there is a low potential for subsurface archaeological <br />deposits. <br />Should an archaeological deposit be encountered during <br />project subsurface construction, all ground -disturbing <br />activities within 25 feet shall be redirected and the on-site <br />archaeologist shall assess the deposit, consult with agencies <br />as appropriate, and make recommendations for the <br />treatment of the discovery. The City shall be notified by the <br />construction contractor within 24 hours of the encounter. <br />If found to be significant by the on-site archaeologist (i.e., <br />eligible for listing in the California Register of Historical <br />Resources), the archaeologist shall prepare a Treatment <br />Plan that describes the measures proposed for reducing <br />impacts to the archaeological deposit. The City of Redwood <br />City Planning and Housing Division shall review the <br />Treatment Plan for adequacy prior to its implementation. <br />Mitigation measures proposed in the Treatment Plan may <br />include, but would not be limited to, recording the <br />archaeological deposit, data recovery and laboratory <br />analysis of recovered archaeological materials, and public <br />outreach. No project ground disturbance shall occur within <br />at least 25 feet of an archaeological historical resource until <br />a qualified archaeologist records and removes the deposit, <br />consistent with the provisions of the Treatment Plan. The <br />applicant shall be responsible for funding implementation <br />of appropriate mitigation measures, and the City shall be <br />responsible for monitoring implementation of the mitigation <br />measures. <br />ATTY/RE50.0035/CC RE50 CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 32 of 49 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for <br />Im?Iementation <br />During all ground <br />disturbing <br />activities <br />RE50. NO, 15661 <br />MUFF NO. 601 <br />Responsibility for <br />Implementation <br />Project Applicant <br />Oversight of <br />Implementation <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.