My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact <br />Mitisation Measures <br />CUL -1 Continued <br />The following tasks shall be undertaken during and after the <br />Water Tank's relocation: <br />• The relocation shall be implemented in accordance with <br />the approved Relocation Plan and all required City <br />noticing and permitting requirements. <br />• The Water Tank shall be reconstructed near the <br />shoreline, consistent with the original historic setting of <br />the structure. <br />• The Water Tank shall be properly placed and secured on <br />permanent footings or foundation. <br />• Reconstruction or repair of the Water Tank shall not <br />materially impair or visually obscure the historic <br />features of the structure. <br />• A qualified preservation architect and structural <br />engineer/contractor shall oversee reconstruction of the <br />Water Tank at its new location to ensure that the work is <br />done in accordance with the Relocation Plan. <br />CUL -2: Ground -disturbing <br />CUL -2a: Prior to project ground disturbance, all <br />activities occurring with <br />construction contractor(s) responsible for overseeing and <br />development of both the <br />operating ground -disturbing mechanical equipment (e.g., <br />proposed project and the project <br />on-site construction managers and backhoe operators) shall <br />variant could have a substantial <br />be alerted to the sensitivity of the project site for buried <br />adverse change on <br />archaeological deposits. A qualified archaeologist that <br />archaeological deposits that <br />meets the Secretary of the Interior's Professional <br />qualify as historical resources, <br />Qualifications Standards for Historic Archeology shall <br />as defined in CEQA Guidelines <br />conduct a "tailgate presentation" to alert relevant <br />Section 15064.5, and could <br />construction personnel of the appropriate procedures that <br />materially impair historic- <br />should be undertaken if archaeological deposits are <br />period archaeological deposits. encountered during construction <br />ATTY/RESO.0035/CC RE50 CERTIFYING FINAL EIR —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 31 of 49 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for Oversight of <br />Implementation Implementation Implementation <br />Prior to any Project Applicant <br />ground disturbing <br />activities <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.