My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Mitigation Monitoring and Reporting Program <br />Timeframe for Responsibility for <br />Impact <br />Mitigation Measures <br />Implementation Implementation <br />NO1-2: Noise from construction <br />N0I-2: The project contractor shall implement the <br />During all phases Project Applicant <br />activities would result in a <br />following measures during construction of the proposed <br />of construction <br />substantial temporary or <br />project: <br />Construction <br />periodic increase in ambient <br />• Equip all construction equipment, fixed or mobile, with <br />Contractor <br />noise levels in the project <br />properly operating and maintained mufflers consistent <br />vicinity above levels existing <br />with manufacturers' standards. <br />without the project. <br />• Place all stationary construction equipment so that <br />emitted noise is directed away from sensitive receptors <br />nearest the active project site. <br />• Locate equipment staging in areas that would create the <br />greatest possible distance between construction -related <br />noise sources and noise -sensitive receptors nearest the <br />active project site during all project construction. <br />• Ensure that all general construction related activities are <br />restricted to between the hours of 7:00 a.m. and 8:00 <br />p.m. on weekdays. No construction shall be permitted <br />on weekends or holidays. <br />Post a sign at all entrances to the work site prior to <br />commencement of the work for the purpose of <br />informing all contractors and subcontractors and all <br />other persons at the property of the basic limitations <br />upon noise and construction activities provided in the <br />noise ordinance. <br />Designate a "disturbance coordinator" at the City of <br />Redwood City who would be responsible for responding <br />to any local complaints about construction noise. The <br />disturbance coordinator would determine the cause of <br />the noise complaint (e.g., starting too early, bad muffler) <br />and would determine and implement reasonable <br />measures warranted to correct the problem. <br />ATTY/RESO.0035/CC RE50 CERTIFYING FINAL EIR —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 39 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />Oversight of <br />Implementation <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.