My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2818 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measures <br />HAZ-1 Continued Physical signs of potentially contaminated materials <br />include staining/discoloration, oily sheen or free phase <br />products, odors, the presence of rubble/debris/refuse, or <br />the presence of buried features that may contain <br />hazardous materials (e.g., drums, buckets, sumps, <br />vaults, or pipelines). The contingency plan shall include <br />guidelines for the collection of soil and/or groundwater <br />samples by a qualified environmental professional prior <br />to further work in the newly discovered affected area. <br />The samples shall be submitted for laboratory analysis <br />by a State -certified laboratory under chain -of -custody <br />procedures. The analytical methods shall be selected by <br />the environmental professional. The analytical results of <br />the sampling shall be reviewed by the qualified <br />environmental professional and submitted to the <br />appropriate regulatory agency, if appropriate. The <br />environmental professional shall provide recommenda- <br />tions, as applicable, regarding soil/waste management, <br />worker health and safety training, and regulatory agency <br />notifications, in accordance with local, State, and <br />federal requirements. Work shall not resume in the <br />area(s) affected until these recommendations have been <br />implemented under oversight by the City, Regional <br />Water Board, or any other regulatory agencies with <br />jurisdiction, as appropriate. <br />4. Designated personnel responsible for implementation of <br />the Response Plan. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 41 of 49 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for Oversight of <br />Implementation Implementation Implementation <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.