My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measures <br />HYD -2 Continued The detailed hydraulic evaluations should also identify <br />receptors and properties that could be affected by the <br />potential changes to flooding conditions. If project <br />improvements could cause erosion, alter existing flooding <br />conditions, or contribute to exceeding the capacity of <br />stormwater drainage systems, project designs shall be <br />modified to reduce the potential flooding and erosion <br />impacts. Modifications to project designs may include the <br />following measures. <br />• Altering the location and design of the retaining wall <br />and embankments that would be constructed to raise the <br />elevation of the project site. <br />• Installing erosion controls systems such as rock <br />protection or erosion resistant vegetation. <br />• Increasing the size of proposed culverts. <br />• Installing cross-flow culverts for improvements through <br />flood zones. <br />• Improving existing off-site stormwater drainage systems <br />that would receive runoff from the project site. <br />• Installing on-site stormwater detention systems in <br />accordance with the City's drainage guidelines for <br />residential development. <br />• Including additional storage by replacing the existing <br />storm drain line within Maple Street with a new 48 -inch <br />storm drain line or larger from US 101 up to and <br />including the tide gate at Redwood Creek to account for <br />tide gate operation of the existing outfall, as determined <br />by the Engineering and Transportation Division. <br />The detailed hydraulic evaluations and proposed changes to <br />the project designs, if necessary, shall be submitted to the <br />City and any other regulatory agencies that have <br />jurisdiction over the improvements prior to the issuance of <br />a grading permit. <br />ATTY/RESO.0035/CC RE50 CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 47 of 49 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for Oversight of <br />Implementation Implementation Implementation <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.