My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res64 4274
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1960-1969 partial
>
1964 partial
>
Res64 4274
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 10:13:18 AM
Creation date
5/14/2018 10:11:59 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
5/4/1964
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. The boundaries of the District are hereby fixed and <br />determined to be as set forth and described in Exhibit A <br />attached hereto and made a part hereof entitled "Boundary <br />Description, Redwood City General Improvement District No. 1-64" <br />Said boundaries are shown on that certain map entitled "Wilsey <br />Ham & Blair, Redwood City General Improvement District No. 1-640 <br />Redwood Shores, District Boundary, City of Redwood City, <br />California", on file in the office of the City Clerk. <br />The City Clerk is hereby authorized and directed to file <br />certified copies of this Resolution, including Exhibit A <br />attached hereto and copies of said map with the County Assessor <br />of San Mateo County and the State Board of Equalization, Sacra- <br />mento, California. <br />5. The five projects for the District as finally <br />determined are hereby generally described as follows: <br />A. Reclamation and Drainage Protect comprising <br />(a) preparation works, including cleaning out of depressions <br />and sloughs in areas to be filled and disposition of unsuitable <br />materials; excavation of ponding basins and waterways; excava- <br />tion, grading, preparation and leveling with on-site material <br />of surface of areas to be filled; and excavation of existing <br />waterways and use of excavated material as fill in specified <br />areas or disposition of same if unsuitable; (b) levee works, <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.