Laserfiche WebLink
I <br />10 <br />SL:MMARY SHEET <br />IMFROVEI7ENT5 COMPLETED IN 1983 <br />r. <br />t: <br />7 <br />N <br />I. <br />ROADWAY <br />I)1 THOUSANDS <br />yl <br />a. Right of Way <br />$1,248,996.00 <br />$1,249 <br />♦i <br />II. <br />WATER SYSTEMS <br />a. Lines <br />$ 141,123.00 <br />$ 142 <br />h. Tanks <br />51,696,750.00 <br />$1,697 <br />III. <br />SANITARY SEWERS <br />a. Lines <br />$ 755,566.00 <br />$ 756 <br />6. Pump Stations <br />$ 472,000.00 <br />$ 472 <br />{ <br />V. <br />RECLAMATION <br />tlj <br />a. Street Right of Way <br />., 53,368.00 <br />S 54 <br />= <br />VI. <br />ROAD FILL'•a� <br />$ 116,144.00 <br />S 117 <br />—: <br />$4.483.447.00 <br />$4,487 <br />