Laserfiche WebLink
11 <br />PROTECT ESTIMATE <br />FOR <br />IMPROVEMENTS SCHEDULED TO BE COMPLETED IN 1983 <br />AREA E, UNIT 1 <br />tH <br />e <br />E+ <br />REDWOOD SHORES PARKWAY <br />U <br />I. <br />ROADWAY <br />W <br />a. Right <br />of Way <br />F <br />4 <br />ITEM <br />QUANTITY <br />UNIT <br />DESCRIPTION <br />UNIT PRICE <br />AMO <br />UNT <br />1 <br />3.8 <br />AC <br />Strip site, dispose of debris <br />$2,625.00 <br />S 9,975.00 <br />aZ <br />V1 <br />2. <br />164,500 <br />SF <br />Excavation and embankment <br />0.34 <br />55,930.00 <br />W <br />3. <br />108,500 <br />SF <br />Subgrade preparation <br />0.10 <br />r <br />10,650.00 r: <br />p4. <br />2,800 <br />LF <br />Type A curb and gutter <br />9.80 <br />27,440.UU <br />H <br />W <br />5. <br />2,600 <br />LF <br />Type B curb and gutter <br />8.75 <br />22,750.00 ' <br />6. <br />79,000 <br />SF <br />4" Asphalt concrete <br />0.95 <br />75,050.00 �N <br />0 <br />7• <br />79,000 <br />SF <br />8" Class 2 AS <br />0.55 <br />43,450.00 •. <br />0 <br />g. <br />79,000 <br />SF <br />10" Class 2 ASB <br />0.60 <br />47,400.00 <br />9. <br />11,200 <br />SF <br />8' Wide AC bike path <br />1.50 <br />16,800.00 <br />A <br />10. <br />5,600 <br />SF <br />4' Wide concrete sidewalk <br />1.95 <br />10,920.00 <br />rco <br />11. <br />4 <br />EA <br />Handicap ramp <br />185.00 <br />740.00 <br />U <br />12. <br />4 <br />EA <br />Survey monument <br />135.00 <br />540.00 <br />R'. <br />13. <br />162 <br />LF <br />54" Storm drain <br />149.00 <br />24,138.00 f <br />14. <br />642 <br />LF <br />48" Storm drain <br />144.00 <br />92.448.00 r� <br />15. <br />80 <br />LF <br />42" Storm drain <br />140.00 <br />11,200.00 <br />16. <br />300 <br />LF <br />36" Storm drain <br />131.00 <br />39,300.00 � <br />17. <br />480 <br />LF <br />27" Storm drain <br />81.00 <br />38,880.90 <br />18. <br />110 <br />LF <br />24" Storm drain <br />77.00 <br />8,4'70.00 ^t4 <br />19. <br />80 <br />LF <br />21" Storm drain <br />63.00 <br />5,040.00 <br />20. <br />140 <br />LF <br />18" Storm drain <br />46.00 <br />6,440.00 <br />21. <br />100 <br />LF <br />15" Storm drain <br />40.00 <br />4,000.00 <br />22. <br />4 <br />EA <br />Type 1 catch basin <br />1,850.00 <br />7,400.00 <br />23. <br />7 <br />EA <br />Type II catch basin <br />2,100.00 <br />14,700.00 <br />24. <br />1 <br />EA <br />Type I Storm drain manhole <br />2,100.00 <br />2,100.00 <br />25. <br />1 <br />EA <br />Type II storm drain manhole <br />2,200.00 <br />2,200.00 <br />26. <br />6 <br />EA <br />Storm drain plug <br />150.00 <br />900.00 l <br />2' <br />1,500 <br />LF <br />Utility duct bank. <br />55.00 <br />82,500.00 i <br />28. <br />1 <br />EA <br />Fire alarm <br />31850.00 <br />3,81M.00 <br />29. <br />2,600 <br />LF <br />Median landscaping s irrigation <br />40.00 <br />104,000.00 <br />30. <br />2 <br />EA <br />Single arm electrolier <br />2,300.00 <br />4,600.00 <br />31. <br />5 <br />EA <br />^,,able arm eluctrolier <br />3,100.90 <br />15.500.00 <br />32. <br />1,500 <br />LF <br />Lighting conduit and wire <br />7.00 <br />10,500.00 <br />33. <br />LOT <br />LS <br />Signalized intersection <br />i251000.00 <br />125,000.00 <br />34. <br />LOT <br />LS <br />Signing, striping, marking <br />Lump Sum <br />12,160.00 <br />35. <br />LOT <br />LS <br />Connect water tank 50 <br />Lump Sum <br />3,120.00 <br />36. <br />LOT <br />LS <br />Lagoon entrance structure <br />Lump Sum <br />10,400.00 <br />37. <br />12,400 <br />CY <br />Excavate interim channel <br />4.35 <br />53,940.00 <br />38. <br />12,400 <br />CY <br />Condition excavated material <br />1.6019,840.00 <br />39. <br />1 <br />EA <br />Dewatering structure (major) <br />14,000.00 <br />34,000.00 <br />iutaL <br />51,058,471.00 <br />189 <br />Engineering <br />5190,525.00 <br />yr <br />Total Constru:tion Cost <br />$1,248,996.00 <br />