Laserfiche WebLink
12 <br />II. NATER SYSTEMS <br />a. Lines <br />ITEM <br />QUANTITY <br />UNIT <br />DESCRIPTION <br />AREA E <br />UNIT 1 <br />2. <br />14,000 <br />1. <br />1,420 <br />LF <br />16" Later Line <br />2. <br />1 <br />EA <br />16" Butterfly Valve <br />3. <br />4 <br />EA <br />Air release valve <br />4. <br />LOT <br />LS <br />Test and sterilize <br />5. <br />160 <br />LF <br />B" water line <br />6. <br />2 <br />EA <br />8" Valve <br />7. <br />2 <br />EA <br />Fire hydrant assembly <br />8. <br />3 <br />EA <br />1 1/2" blowoff Assembly <br />J. <br />2 <br />EA <br />Irrigation service <br />UNIT PRICE AMOUNT <br />65.00 $92,300.00 <br />$3,050.00 $ 3,050.00 7 <br />925.00 5 3,300.00 t_ <br />Lump Sum 5 1,375.00 <br />32.00 5 5,120.00 <br />$1,150.00 $ 2,300.00 )vi <br />$2,900.00 $ 5,800.00 <br />850.00 $ 2,550.00 <br />$1,600.00 5 3,200.00 <br />Total $11.9,595.00 <br />18% Engineering 5 21,528.00 f <br />X. <br />Total Construction Cost $141,123.00 t.'. <br />Strip site, dispose of debris 2,625.00 $ 3,150.00 <br />Excavation 4.85 67,900.00 <br />Concrete fcundation 475.00 356,250.00 <br />Furnish and erect steel tank 1.15 862,500.00 <br />Tank cathodic protection Lump Sum 58,400.00 <br />18" water line 107.00 64,200.00 <br />Pumping facility Lump Sum -92,000.00 <br />Landscaping Lump Sum 52,000.00 <br />Concrete piles 30.50 1,049,200.00 <br />Condition excavated material l.bn 22,400.9; <br />Fencing 15.00 10,500.n0 <br />Storm water pump s discharge piping Lump Sum 15,500.00 <br />Automatic controls Lump Sum 21,000.00 <br />Total $2,875,000.00 <br />18% Engineering 517,500.00 <br />Total Construction Cost $3,392,500.00 <br />50t of $3,392,500 or 51,596,250.00 will be <br />outlaved in 1982 and the other 501 in 1983. <br />b. <br />Tanks (Water) <br />1. <br />1.2 <br />AC <br />2. <br />14,000 <br />CY <br />3. <br />750 <br />CY <br />4. <br />750,000 <br />LB <br />1.y _ 5. <br />Lump Sum <br />LS <br />6. <br />600 <br />LF <br />i 7. <br />Lump Sum <br />LS <br />8. <br />Lump Sum <br />LS <br />9. <br />!,400 <br />LF <br />10. <br />14,000 <br />CY <br />il. <br />700 <br />LF <br />12. <br />Lump S -m <br />LS <br />13. <br />Lump Sum <br />LS <br />UNIT PRICE AMOUNT <br />65.00 $92,300.00 <br />$3,050.00 $ 3,050.00 7 <br />925.00 5 3,300.00 t_ <br />Lump Sum 5 1,375.00 <br />32.00 5 5,120.00 <br />$1,150.00 $ 2,300.00 )vi <br />$2,900.00 $ 5,800.00 <br />850.00 $ 2,550.00 <br />$1,600.00 5 3,200.00 <br />Total $11.9,595.00 <br />18% Engineering 5 21,528.00 f <br />X. <br />Total Construction Cost $141,123.00 t.'. <br />Strip site, dispose of debris 2,625.00 $ 3,150.00 <br />Excavation 4.85 67,900.00 <br />Concrete fcundation 475.00 356,250.00 <br />Furnish and erect steel tank 1.15 862,500.00 <br />Tank cathodic protection Lump Sum 58,400.00 <br />18" water line 107.00 64,200.00 <br />Pumping facility Lump Sum -92,000.00 <br />Landscaping Lump Sum 52,000.00 <br />Concrete piles 30.50 1,049,200.00 <br />Condition excavated material l.bn 22,400.9; <br />Fencing 15.00 10,500.n0 <br />Storm water pump s discharge piping Lump Sum 15,500.00 <br />Automatic controls Lump Sum 21,000.00 <br />Total $2,875,000.00 <br />18% Engineering 517,500.00 <br />Total Construction Cost $3,392,500.00 <br />50t of $3,392,500 or 51,596,250.00 will be <br />outlaved in 1982 and the other 501 in 1983. <br />