My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt82 DDA Redwood Shores Inc. GID 1-64
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1982
>
Agmt82 DDA Redwood Shores Inc. GID 1-64
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:14:09 PM
Creation date
5/14/2018 12:08:16 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Redwood Shores Inc.
PROJECT NAME
GID 64
RMP File Number
304
Date
6/16/1982
MO Ref
SEE ORD 1859
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L3 <br />III. SANITARY SEWERS <br />a. Liner <br />ITEM QUANTITY UNIT DESCRIPTION <br />AREA E - UNIT 1 <br />AREA E - UNIT 2 <br />1. 1,230 LF <br />2. 1 EA <br />ARE' G - UNIT 1 <br />(- 1. 1,100 LF <br />2. 2,350 IF <br />r <br />C) <br />TOTAL $231,410.00 <br />$231,410,00 <br />f <br />UNIT <br />PRICE <br />AMOUNT <br />I TOTAL <br />AREA E - UNIT 2 <br />1. 1,230 LF <br />2. 1 EA <br />ARE' G - UNIT 1 <br />(- 1. 1,100 LF <br />2. 2,350 IF <br />r <br />C) <br />TOTAL $231,410.00 <br />$231,410,00 <br />_ <br />t <br />1. <br />1,445 <br />LF <br />14" Force main <br />$ 60.00 <br />$ 86,700.00 <br />2. <br />30 <br />LF <br />10" VCP sewer <br />77.00 <br />2,310.00 <br />modified manhole <br />3. <br />11590 <br />LF <br />all VCP sewer <br />65.00 <br />107,350.00 <br />F+ - <br />4. <br />650 <br />LF <br />6" Firce main <br />40.00 <br />26,000.00 <br />5. <br />5 <br />:.A <br />Type A sewer manhole <br />2,400.00 <br />12,000.00 <br />_- <br />6. <br />1 <br />EA <br />Sewer plug <br />150.00 <br />1,050.00 <br />AREA E - UNIT 2 <br />1. 1,230 LF <br />2. 1 EA <br />ARE' G - UNIT 1 <br />(- 1. 1,100 LF <br />2. 2,350 IF <br />r <br />C) <br />b. Pump Stations (Sanitary) <br />AREA G - UNIT 1 <br />1. Lot LS Pump Station <br />LUMP SUM <br />18% Engineering <br />TOTAL CONSTRUCTION COST <br />a <br />$400,000.00 <br />72,000.00 <br />$472,000.00 <br />TOTAL $231,410.00 <br />$231,410,00 <br />_ <br />14" Force main <br />60.00 73,800.00 <br />• <br />X <br />modified manhole <br />15,000.00 15,000.00 <br />NTAL $ 88,800.00 <br />$ 88,800.00 <br />"+ <br />•1 <br />20" VCP <br />150.00 165,000.00 <br />S <br />18" Force main <br />66.00 155,100.00 <br />TOTAL 5320,100.00 <br />22J0,'. 00.00 <br />TOTAL <br />$640,310.00 <br />- <br />189 Engineering <br />115,256.00 <br />TOTAL CONSTRUCTION COST <br />$755,866.00 <br />b. Pump Stations (Sanitary) <br />AREA G - UNIT 1 <br />1. Lot LS Pump Station <br />LUMP SUM <br />18% Engineering <br />TOTAL CONSTRUCTION COST <br />a <br />$400,000.00 <br />72,000.00 <br />$472,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.