Laserfiche WebLink
N <br />H <br />z <br />O <br />O <br />Q <br />O <br />W <br />H <br />g <br />az <br />N <br />W <br />w <br />0 <br />m <br />O <br />W <br />14 <br />V. RECLAMATION <br />a. Street Right-of-way <br />ITEM QUANTITY <br />UNIT <br />DESCRIPTION <br />UNIT PRICE <br />AMOUNT <br />1,400 <br />LF <br />$38.12 <br />TO'nL CONSTRUCTION <br />COST INCLUDING <br />ENGINEERING <br />VI. ROAD FILL <br />Above Elev. 100.00 <br />1,400 LF <br />TOTAL <br />$53,368.00 <br />$53,368.00rj3 <br />$82.96 5116,144.00 <br />r <br />TOTAL CONSTRUCTION COST INCLUDING ENGINEERING $116,144.00'.` <br />