Laserfiche WebLink
Y <br />17 !t <br />PROJECT ESTIMATE FOR <br />IMPROVEMENTS SCHEDULED TO BE COMPLETED IN 1985 <br />zAREA <br />A <br />I. <br />ROADWAY <br />U <br />REDWOCD SHORES PARKWAY <br />U <br />a. Right <br />-of -Way (Between <br />Holly F Lands of Redwood Shores, Inc.) <br />o <br />F <br />Item <br />Quantity <br />Unit <br />Description <br />Unit Price <br />Amount <br />0.4 <br />A� <br />Strip site, dispose of debris <br />$2,625.00 <br />S 1,050.00 <br />1. <br />:A <br />4A4 <br />N <br />2. <br />16,000 <br />SF <br />Excavation and embankment <br />0.34 <br />5,440.00 <br />U <br />3. <br />10,500 <br />SF <br />Subgrade preparation <br />0.10 <br />1,050.00 <br />H <br />Pk <br />4. <br />330 <br />LF <br />Type A curb and gutter <br />9.80 <br />3,234.00 <br />N <br />{ <br />5. <br />260 <br />LF <br />Type 3 curb and gutter <br />8.75 <br />2,275.00 <br />0 <br />6. <br />6,900 <br />SF <br />4" Asphalt concrete <br />0.95 <br />6,555.00 <br />q j <br />7. <br />4,700 <br />SF <br />2" AC overlay <br />0.50 <br />2,350.00 <br />of <br />6,900 <br />SF <br />22" Class 2 AB <br />1.65 <br />11,395.00IJ� <br />a i <br />9. <br />1,440 <br />SF <br />e' Wide AC bike path <br />1.50 <br />2,160.00:," <br />10. <br />720 <br />SF <br />4' Wide concrete sidewalk <br />1.95 <br />1,404.OP) <br />11. <br />150 <br />LF <br />Utility duct bank <br />55.00 <br />8,250.00%' <br />12. <br />.30 <br />LF <br />Median Landscaping 6 irrigation <br />40.00 <br />5,200.00 <br />13. <br />1 <br />EA <br />Double arm electrolier <br />53,100.00 <br />3,100.00 <br />14. <br />150 <br />LF <br />Lighting conduit and wire <br />7.00 <br />1,050.00 <br />L,♦ <br />15. <br />LOT <br />Lq <br />signalized intersection (2 legs) <br />Lump Sum <br />62,500.00 <br />16. <br />LOT <br />LS <br />Signing, s0riping, marking <br />Lump Sum <br />1,200.00 <br />.� <br />TOTAL ESTIMATED CONSTRUCTICM, COST: <br />$118.203.00 <br />DEDUCT ITEM NO. 12 <br />5,200.00 <br />(Landscaping by the Developer) <br />$113,003.00 <br />13b 6ngincering and Administration <br />$ 20.341.00 <br />w <br />$133,344.00 <br />t <br />509 of <br />$133,344.00 District the 5 66,672.00 <br />other <br />50% is Redwood Shores, Inc. <br />:) <br />Additional <br />fund for <br />traffic <br />signal <br />g <br />Total <br />Cost $130,000 <br />- 562,500 <br />67,500.00 <br />$134,172.00 <br />Plus 189 <br />of $67,500.00 <br />12,150 00 <br />TOTAL <br />CONSTRUCTION <br />COST <br />$146,322.00 <br />i <br />1 <br />I <br />, <br />AL <br />