Laserfiche WebLink
18 <br />VII. HOLLY STREET INTERCHANGE <br />Item Quant LtY Unit Descriptlon <br />1. City Participation in Holly Street Interchange <br />TOTAL CONSTRUCTION COST <br />r <br />41 <br />Unit Price Amount <br />b <br />Lump Sum Si".50,000.00 <br />$1.450,000.00 n} <br />VIII. <br />PUMP STATION <br />(AREA "A" - LAGOON) <br />f <br />1. <br />LOT <br />LS <br />Inlet Structure <br />Lump Sum <br />S 76,200.00 C. <br />2. <br />130 <br />LF <br />60" RCP <br />$180.00 <br />23,400.00 Z , <br />3. <br />LOT <br />LS <br />Pump Structure <br />Lump Sum <br />229,500.00 ; <br />t <br />... <br />( <br />6 <br />EA <br />10,000 gpm pumps with controls <br />30,900.00 <br />185,400,00 <br />3. <br />LOT <br />LS <br />Outlet structure <br />Lump Sum <br />133,600.00 <br />TOTAL ESTIMATED CONSTRUCTION COST <br />$648,100.00 ' <br />18: Engineering <br />5116,658.00 _:•'. <br />TOTAL CONSTRUCTION COST <br />$764,758.00 -Vt <br />ic, <br />t <br />-v7. <br />