Laserfiche WebLink
mot, <br />20 <br />PROJECT ESTIMATE FOR <br />+ <br />IMPROVEMENTS SCHEDULED TO BE COMPLETED IN <br />1986 <br />is <br />AREA A <br />REDWOOD SHORES PARKWAY <br />7 <br />� <br />I. <br />ROADWAY <br />a. Right -of -Way <br />f <br />ITEM <br />OUAITTITY <br />UNIT <br />DESCRIPTION <br />UNIT PRICE <br />,AMOUNT <br />T <br />1. <br />7,1 <br />AC <br />Strip site, dispose of debris <br />$ 2,625.00 <br />S 18,63 <br />2. <br />238,800 <br />SF <br />Excavation and embankment <br />0.34 <br />81,192.00 <br />3. <br />153,000 <br />SF <br />Subgrade and preparation <br />0.10 <br />15,300.00 <br />4. <br />6,140 <br />LF <br />Type A curb and gutter <br />9.80 <br />60,172.00 <br />:F <br />S. <br />98,700 <br />BF <br />4" Asphalt concrete <br />0.95 <br />93,765.00 <br />t: <br />6. <br />121,550 <br />SF <br />2" AC overlay <br />0.50 <br />60,775.00 <br />7. <br />98,700 <br />SF <br />22" Class 2 AB <br />1.65 <br />162,855.00 <br />:r <br />8. <br />22,200 <br />SF <br />S' Wide AC bike path <br />1.50 <br />33,300.00 <br />N <br />9. <br />12,600 <br />SF <br />4' Wide concrete sidewalk <br />1.95 <br />24,570.00 <br />= <br />10. <br />12 <br />EA <br />Handicap ramp <br />185.00 <br />2,220.00 <br />11. <br />6 <br />EA <br />Survey monument <br />135.00 <br />810.00 <br />12. <br />30 <br />LF <br />54" Storm drain <br />149.00 <br />4,470.00 <br />13. <br />480 <br />LF <br />48" Storm drain <br />144.00 <br />69,120.00 <br />14. <br />315 <br />LF <br />42" Storm drain <br />140.00 <br />44,100.00 <br />15. <br />8:0 <br />LF <br />39" Storm drain <br />135.00 <br />120,150,00 <br />16. <br />220 <br />LF <br />36" Storm drain <br />131.00 <br />28,820.00 <br />17. <br />16 <br />LF <br />33" Storm drain <br />108.00 <br />1,728.00 <br />18, <br />55 <br />LF <br />30" Storm drain <br />104.00 <br />5,720.00 <br />19. <br />92 <br />LF <br />27" Storm drain <br />81.00 <br />7,452.00 <br />'? <br />300 <br />LF <br />24" Storm drain <br />77.00 <br />23,100.00 <br />21. <br />180 <br />LF <br />18" Storm drain <br />46.00 <br />8,280.00 <br />22. <br />495 <br />LF <br />15" Storm drain <br />40.00 <br />19,800.00 <br />; <br />27. <br />14 <br />EA <br />Type i catch basin <br />1,850.00 <br />25,900.00 <br />24. <br />9 <br />EA <br />Type II catch basin <br />2,100.00 <br />18,900.00 <br />y,•1 <br />25. <br />7 <br />EA <br />Type II storm drain manhole <br />2,200.00 <br />15,40n,g0 <br />26. <br />9 <br />EA <br />Storm drain plug <br />150.00 <br />1,350.00 <br />.4 .a.7✓1 <br />27. <br />3,465 <br />LF <br />Utility duct hank <br />55.00 <br />190,575.00- <br />28, <br />a <br />EA <br />Single atm cIu�Lrclier <br />2,300.00 <br />18,400.00 <br />29. <br />12 <br />EA <br />Double arm electrolier <br />3,100.00 <br />37,200.00 <br />7.. <br />30. <br />3,200 <br />LF <br />Lighting conduit and wire <br />7.00 <br />22,400.00 <br />31. <br />1 <br />EA <br />Signalized intersection <br />125,000.00 <br />125,000.00 <br />32. <br />LOT <br />LS <br />Signing, striping, marking <br />Lump Sum <br />24,800.00 <br />T <br />33. <br />2 <br />EA <br />Retention basin entrance structure <br />10,500.00 <br />21,000.00 <br />34. <br />2 <br />EA <br />Major dewatering structure <br />34,000.00 <br />68,000.00 <br />Total <br />51,455,261.50 <br />28% <br />Enuinecitng <br />_61,942.00 <br />Total Construction Cost <br />$1,717,210.00 <br />r <br />1 <br />•� J' <br />` <br />50% <br />of $1,717,210.00 or $858.605.00 <br />is <br />District's responsibility the ocher <br />50: <br />is <br />Redvond Shores, Inc. <br />mot, <br />