Laserfiche WebLink
21 <br />PROJECT ESTIMATE FOR <br />P@RUVEMENTS SCHEDULED TO BE COMPLETED IN 1986 <br />AREA E. UNIT 2 <br />REDWOOD SKIRES PARKWAY <br />I. ROADWAY <br />a. Right -of -Way <br />ITEM <br />QUANTITY <br />UNIT <br />DESCRIPTION <br />UNIT PRICE <br />1. <br />3.3 <br />AC <br />Strip site, dispose of debris <br />$ 2,625.OU <br />1. <br />143,000 <br />SF <br />Excavation and embankment <br />0.34 <br />3. <br />99,600 <br />SF <br />Subgraie preparation <br />0.10 <br />4. <br />2,400 <br />LF <br />Type A curb and gutter <br />9.80 <br />5. <br />2,200 <br />LF <br />Type B curb and gutter <br />8.75 <br />6. <br />74,200 <br />SF <br />4" Asphalt concrete <br />0.95 <br />7. <br />74,200 <br />SF <br />8" Class 2 AB <br />0.55 <br />8. <br />74,200 <br />SF <br />10" Claes 2 ASB <br />0.60 <br />9. <br />9,600 <br />SF <br />6' Wide AC bike path <br />1.50 <br />10. <br />4,800 <br />SF <br />4' Wide concrete sidewalk <br />1.95 <br />11. <br />4 <br />EA <br />Handicap ramp <br />185.00 <br />12. <br />3 <br />EA <br />Survey monument <br />135.00 <br />13. <br />120 <br />LF <br />54" Storm drain <br />149.00 <br />14. <br />650 <br />LF <br />48" Storm drain <br />144.00 <br />15. <br />30 <br />LF <br />42" Storm train <br />140.00 <br />16. <br />300 <br />LF <br />36" Storm drain <br />131.00 <br />17. <br />455 <br />LF <br />27" Storm arain <br />81.00 <br />18. <br />70 <br />LF <br />18" Storm drain <br />46.00 <br />19. <br />70 <br />LF <br />15" Storm drain <br />40.00 <br />20. <br />1 <br />EA <br />Type 1 catch basin <br />1,850.00 <br />21. <br />8 <br />EA <br />Type II catch basin <br />2,100.00 <br />22. <br />2 <br />EA <br />Type II atom drain manhole <br />2,200.00 <br />23. <br />6 <br />EA <br />Storm drain plug <br />150.00 <br />24. <br />1,220 <br />LF <br />Utility duct bank <br />55.00 <br />25. <br />1 <br />EA <br />Fire Alarm <br />3,850.00 <br />26. <br />1,100 <br />LF <br />Median landscaping 5 irrigation <br />40.00 <br />27. <br />2 <br />EA <br />Single arm electrolier <br />2,300.00 <br />28. <br />5 <br />E.I.Double <br />arm electrelier <br />3,100.00 <br />29. <br />1,220 <br />LF <br />Lighting conduit and wire <br />7.00 <br />30. <br />LOT <br />LS <br />Signing, striping, marking <br />Lump Sum <br />31. <br />LOT <br />LS <br />Lagoon entrance structure <br />Lump Sum <br />32. <br />1 <br />EA <br />Dewatering structure <br />34,000.00 <br />182 Engineering <br />Total Construction Cost <br />i <br />A:9UUNT <br />$ .9,662.50 <br />48,620.00 <br />9,960.00 <br />23,520.00 <br />19,250.00 �. <br />70,490.00 t4 <br />40,810.00 7 <br />44,520.00 <br />14,400.00 ya <br />9,360.00 <br />740.00 <br />4115.00 <br />17,880.00 <br />95,040.00 <br />4,200.00 <br />39,300.00 <br />36,855.00 <br />3,220.00 <br />2,800.00 <br />1,850.00 <br />16,800.00 <br />4,400.00 <br />900.00 <br />67,100.00 <br />3,850.On <br />44,000.00 <br />4,600.00 <br />15,500.00 <br />8,540.00 <br />10,880.00 <br />10,300.00 <br />34,000.00 <br />$712.952.50 <br />$128,332.00 <br />$841.285.00 <br />