21
<br />PROJECT ESTIMATE FOR
<br />P@RUVEMENTS SCHEDULED TO BE COMPLETED IN 1986
<br />AREA E. UNIT 2
<br />REDWOOD SKIRES PARKWAY
<br />I. ROADWAY
<br />a. Right -of -Way
<br />ITEM
<br />QUANTITY
<br />UNIT
<br />DESCRIPTION
<br />UNIT PRICE
<br />1.
<br />3.3
<br />AC
<br />Strip site, dispose of debris
<br />$ 2,625.OU
<br />1.
<br />143,000
<br />SF
<br />Excavation and embankment
<br />0.34
<br />3.
<br />99,600
<br />SF
<br />Subgraie preparation
<br />0.10
<br />4.
<br />2,400
<br />LF
<br />Type A curb and gutter
<br />9.80
<br />5.
<br />2,200
<br />LF
<br />Type B curb and gutter
<br />8.75
<br />6.
<br />74,200
<br />SF
<br />4" Asphalt concrete
<br />0.95
<br />7.
<br />74,200
<br />SF
<br />8" Class 2 AB
<br />0.55
<br />8.
<br />74,200
<br />SF
<br />10" Claes 2 ASB
<br />0.60
<br />9.
<br />9,600
<br />SF
<br />6' Wide AC bike path
<br />1.50
<br />10.
<br />4,800
<br />SF
<br />4' Wide concrete sidewalk
<br />1.95
<br />11.
<br />4
<br />EA
<br />Handicap ramp
<br />185.00
<br />12.
<br />3
<br />EA
<br />Survey monument
<br />135.00
<br />13.
<br />120
<br />LF
<br />54" Storm drain
<br />149.00
<br />14.
<br />650
<br />LF
<br />48" Storm drain
<br />144.00
<br />15.
<br />30
<br />LF
<br />42" Storm train
<br />140.00
<br />16.
<br />300
<br />LF
<br />36" Storm drain
<br />131.00
<br />17.
<br />455
<br />LF
<br />27" Storm arain
<br />81.00
<br />18.
<br />70
<br />LF
<br />18" Storm drain
<br />46.00
<br />19.
<br />70
<br />LF
<br />15" Storm drain
<br />40.00
<br />20.
<br />1
<br />EA
<br />Type 1 catch basin
<br />1,850.00
<br />21.
<br />8
<br />EA
<br />Type II catch basin
<br />2,100.00
<br />22.
<br />2
<br />EA
<br />Type II atom drain manhole
<br />2,200.00
<br />23.
<br />6
<br />EA
<br />Storm drain plug
<br />150.00
<br />24.
<br />1,220
<br />LF
<br />Utility duct bank
<br />55.00
<br />25.
<br />1
<br />EA
<br />Fire Alarm
<br />3,850.00
<br />26.
<br />1,100
<br />LF
<br />Median landscaping 5 irrigation
<br />40.00
<br />27.
<br />2
<br />EA
<br />Single arm electrolier
<br />2,300.00
<br />28.
<br />5
<br />E.I.Double
<br />arm electrelier
<br />3,100.00
<br />29.
<br />1,220
<br />LF
<br />Lighting conduit and wire
<br />7.00
<br />30.
<br />LOT
<br />LS
<br />Signing, striping, marking
<br />Lump Sum
<br />31.
<br />LOT
<br />LS
<br />Lagoon entrance structure
<br />Lump Sum
<br />32.
<br />1
<br />EA
<br />Dewatering structure
<br />34,000.00
<br />182 Engineering
<br />Total Construction Cost
<br />i
<br />A:9UUNT
<br />$ .9,662.50
<br />48,620.00
<br />9,960.00
<br />23,520.00
<br />19,250.00 �.
<br />70,490.00 t4
<br />40,810.00 7
<br />44,520.00
<br />14,400.00 ya
<br />9,360.00
<br />740.00
<br />4115.00
<br />17,880.00
<br />95,040.00
<br />4,200.00
<br />39,300.00
<br />36,855.00
<br />3,220.00
<br />2,800.00
<br />1,850.00
<br />16,800.00
<br />4,400.00
<br />900.00
<br />67,100.00
<br />3,850.On
<br />44,000.00
<br />4,600.00
<br />15,500.00
<br />8,540.00
<br />10,880.00
<br />10,300.00
<br />34,000.00
<br />$712.952.50
<br />$128,332.00
<br />$841.285.00