My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt82 DDA Redwood Shores Inc. GID 1-64
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1982
>
Agmt82 DDA Redwood Shores Inc. GID 1-64
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:14:09 PM
Creation date
5/14/2018 12:08:16 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Redwood Shores Inc.
PROJECT NAME
GID 64
RMP File Number
304
Date
6/16/1982
MO Ref
SEE ORD 1859
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22 <br />O <br />II. <br />WATER SYSTEMS <br />> <br />a. Lines <br />U <br />ITEM <br />QUANTITY <br />UNIT <br />DESCRIPTION <br />UNIT PRICE <br />AMOUNT <br />TOTAL <br />U <br />W <br />AREA <br />"A'• <br />F <br />1. <br />170 <br />LF <br />le" water lino <br />$ 107.00 <br />5 13,910.00 <br />x <br />2. <br />300 <br />LF <br />12" Water line <br />44.00 <br />13,200.00 <br />3. <br />6 <br />EA <br />Fire hydrant assembly <br />11900.00 <br />17,400.00 <br />4. <br />5 <br />EA <br />1-1/2" Blowoff assembly <br />850.00 <br />4,250.00 <br />W <br />5. <br />4 <br />EA <br />Irrigation service <br />1,600.00 <br />6,400.00 <br />N <br />6. <br />440 <br />LF <br />Testing 6 sterilization <br />1.25 <br />550.00 <br />f <br />P4 <br />TOTAL <br />$ 55,710.00 <br />5 27,855.00 tt <br />T <br />F, <br />50% of $55,710.00 or $27,855.00 is <br />District responsibility. <br />The other <br />` <br />o <br />50% is paid by Redwood Shores, Inc. <br />O <br />U <br />Q <br />AREA <br />"E" - Unit <br />2 <br />1. <br />160 <br />LF <br />B" water Line <br />$ 32.00 <br />$ 5,120.00 <br />t" <br />2. <br />2 <br />EA <br />8" Valve <br />1,150.00 <br />2,300.00 <br />3. <br />2 <br />EA <br />Fire hydrant assembly <br />2.900.00 <br />5,800.00 <br />!r <br />4. <br />3 <br />EA <br />1-1/2" Blowoff assembly <br />850.00 <br />2,550.00 <br />�t <br />S. <br />1 <br />EA <br />Irrigation service <br />1,600.00 <br />1,600.00 <br />6. <br />1,220 <br />LF <br />16" Water line <br />65.00 <br />79,300.00 <br />7. <br />1 <br />EA <br />16" Butterfly valve <br />3,050.00 <br />3,050.00 <br />S. <br />3 <br />EA <br />Air release valve <br />825.00 <br />2,475.00 <br />• <br />9. <br />LOT <br />LS <br />Test and sterilize <br />Lump Sum <br />1,725.00 <br />i <br />TOTAL <br />$103,920.00 <br />$103,920.00 <br />$131,775.00 <br />18% <br />Engineering <br />23,720.00 <br />TOTAL CONSTRUCTION COST <br />$155,495.01 <br />O <br />
The URL can be used to link to this page
Your browser does not support the video tag.