Laserfiche WebLink
23 <br />j <br />-„ III. <br />SANITARY SEWERS <br />a. <br />Lines <br />O <br />ITEM <br />QUANTITY <br />UNIT <br />DESCRIPTION <br />UNIT PRICE <br />AMOUNT <br />TOTAL <br />:J <br />O <br />AREA <br />"A" <br />W <br />H <br />1. <br />1, <00 <br />LF <br />10" VCP sewer <br />$ 77.00 <br />$107,800.00 <br />2. <br />600 <br />I' <br />8" VCP sewer <br />65.00 <br />39,000.00 <br />l <br />Z <br />3. <br />1,005 <br />LF <br />6" Force main <br />40.00 <br />40,200.00 <br />r• <br />4. <br />7 <br />EA <br />Type A sewer manhole <br />2,400.00 <br />16,900.00 <br />7 <br />W <br />5. <br />7 <br />EA <br />Sewer plug <br />150.00 <br />1,050.00 <br />+i <br />U <br />� <br />H <br />$204,050.00 <br />$102,425,00 <br />\, <br />O <br />i <br />50♦ of $204,850.00 or $102,425.00 <br />is <br />District responsibility, <br />the other 503 <br />paid by Redwood Shores, <br />Inc <br />A <br />f <br />U <br />AREA <br />"E" <br />- Unit 2 <br />L <br />W <br />1. <br />1,130 <br />IF <br />B" VCP Sewer <br />$ 65.00 <br />5 73,450.00 <br />�I <br />2. <br />1,000 <br />LF <br />6" Force main <br />40.00 <br />40,000.00 <br />y <br />` 3. <br />1' <br />3 <br />EA <br />Type Asewer manhole <br />2.400.00 <br />7.200.00 <br />4. <br />6 <br />EA <br />SewerP <br />150.00 <br />900.00 <br />_ <br />$121,550.00 <br />$121,550.00 <br />) <br />O <br />TTAL <br />$223,975.00 <br />r <br />S1g�• <br />18% <br />Engineering <br />40,316.00 <br />TOTAL CONSTRUCTION COST <br />$264,291.00 <br />•\ <br />b. <br />Pump Stations <br />(Sanitary) <br />•VM_ <br />AREA <br />"A" <br />1. <br />2 <br />EA <br />Manor sewer pump <br />station <br />$152,000.00 <br />$304,000.00 <br />$304,000.00 <br />= <br />13% <br />Engineering <br />547720.00 <br />TOTAL CONSTRUCTION COST <br />$358.720.00 <br />' <br />50% of $358,720.00 or $179,360.00 <br />is <br />:> <br />District responsibility, <br />the other SOi <br />f <br />will be paid by Redwood <br />Shores, Inc. <br />j <br />