Laserfiche WebLink
27 <br />PROJECT ESTIMATE <br />FOR <br />Lw.PRMMENTS SCHEDULED TO BE COMPLETED IN 1987 <br />AREA F. UNIT 1 <br />• <br />MARINE WORLD PARKWAY <br />F <br />1. ROADWAY <br />m <br />Right <br />of Hay <br />a <br />f' <br />U <br />0 Item <br />Quantity <br />Unit <br />Description <br />Unit Ptice <br />Amount <br />W <br />F AREA F <br />4 <br />UNIT 1 <br />1. <br />3.5 <br />AC <br />Strip site, dispose of debris <br />$1,625.00 <br />9,187.50 <br />2. <br />154,100 <br />SF <br />Excavation and embankment <br />0.34 <br />52,394.00 <br />rr <br />y 3. <br />96,600 <br />SF <br />Subgrade preparation <br />0.10 <br />9.660.00 <br />t: <br />4. <br />2,600 <br />LF <br />Type A curb and gutter <br />9.80 <br />25.480.00 <br />•+ 5. <br />2,400 <br />LF <br />Type B curb and gutter <br />8.75 <br />21,000.00 <br />4 <br />6. <br />69.500 <br />SF <br />4" Asphalt concrete <br />0.95 <br />66,025.00 <br />it <br />0 7. <br />69,500 <br />SF <br />8" Class 2 AB <br />0.55 <br />38,225.00 <br />'�- <br />rn 8. <br />69,%00 <br />SF <br />10" Class 2 ASB <br />0.60 <br />41,700.00 <br />V <br />9. <br />9,920 <br />SF <br />8' Wide AC bike path <br />1.50 <br />14,880.00 <br />A10. <br />5,400 <br />SF <br />4' Wide concrete sidewalk <br />1.95 <br />10,530.00 <br />�n 11. <br />4 <br />EA <br />Handicap ramp <br />185.00 <br />740.00 <br />12. <br />4 <br />EA <br />Survey monument <br />135.00 <br />540.00 <br />t <br />13. <br />350 <br />LF <br />42" Storm drain <br />140.00 <br />49,000.00 <br />�l <br />14. <br />460 <br />LF <br />39" Storm drain <br />135.00 <br />62,100.00 <br />t. <br />15. <br />320 <br />LF <br />30" Storm drain <br />104.00 <br />33,280.00 <br />i 16. <br />136 <br />LF <br />21" Storm drain <br />63.00 <br />8,568.00 <br />17. <br />228 <br />LF <br />18" Storm drain <br />46.00 <br />10,488.00 <br />N <br />18 <br />104 <br />LF <br />15" Storm drain <br />40.00 <br />4,160.00 <br />19. <br />5 <br />EA <br />Type I catch basin <br />1,850.00 <br />9,250.00 <br />20. <br />5 <br />EA <br />Type II catch basin <br />2,100.00 <br />10,500.00 <br />21. <br />4 <br />EA <br />Storm drain plug <br />150.00 <br />600.00 <br />22. <br />1,300 <br />LF <br />Utility duct bank <br />55.00 <br />71,500.00 <br />23. <br />1 <br />EA <br />Fire alarm <br />3,850.00 <br />3,850.00 <br />24. <br />1,200 <br />LF <br />Median landscaping S irrigation <br />40.00 <br />48,000.00 <br />25. <br />2 <br />EA <br />Single arm electrolier <br />2,300.00 <br />4.600.00 <br />26. <br />5 <br />EA <br />Double arm electrolier <br />3,100.00 <br />15,500.00 <br />27. <br />1.300 <br />LF <br />Lighting conduit and wire <br />7.00 <br />9,100.00 <br />28. <br />LOT <br />LS <br />Signalized intersection <br />125,000.00 <br />125,00'0.00 <br />29. <br />LOT <br />LS <br />Signing, striping, marking <br />Lump S..m <br />10'i00.00 <br />30. <br />1 <br />EA <br />Lagoon sort. and dewater structure <br />$29,000.00 <br />29.000.00 <br />TOTAL ESTDIATED CONSTRUCTION COST <br />$795.817.50 <br />' <br />187. ENGINEERING <br />$143,148.00 <br />TOTAL CONSTRUCTION COST <br />$939.066.00 <br />[7 <br />}'Lvr1�<ii,T'+'tW�Y13,4».'�''y`.f�.\t s9.9Yt2'• <br />W <br />