<br />PROJECT ESTIMATE
<br />FOR
<br />IMPROVEMENTS SCHEDULED TO BE COMPLETED
<br />IN 1987
<br />AREA C, UNIT 1
<br />REDWOOD SHORES PAR1,WAY
<br />1. ROADWAY
<br />a. Right
<br />of Way
<br />Item
<br />Quantity
<br />Unit
<br />Description
<br />Unit Price
<br />Amount
<br />AREA C
<br />UNIT 1
<br />1.
<br />LOT
<br />LS
<br />Strip site, dispose of debris
<br />Lump Sum
<br />7,700.00
<br />2.
<br />127,600
<br />SF
<br />Excavation 6 embankment for R/H
<br />$ 0.34
<br />43,384.00
<br />3.
<br />2,200
<br />LF
<br />Type A curb 6 gutter
<br />9.30
<br />21,560.00
<br />4.
<br />2,200
<br />LF
<br />Type B curb S gutter
<br />8.75
<br />19,250.00
<br />S.
<br />50,600
<br />SF
<br />4" Asphalt concrete
<br />0.95
<br />48,070.00
<br />6.
<br />50,600
<br />SF
<br />8" Claes 2 AB
<br />0.53
<br />27,830.00
<br />.�
<br />7.
<br />50,600
<br />SF
<br />10" Class 2 ASH
<br />0.60
<br />30,360.00
<br />t,;
<br />8.
<br />8,800
<br />SF
<br />3-1/2" AC bike path
<br />1.50
<br />13,200.00
<br />=
<br />9.
<br />4,400
<br />SF
<br />3-1/2" Conc. sidewalk
<br />1.95
<br />48,580.00
<br />10.
<br />4
<br />EA
<br />Handicap ramp
<br />185.00
<br />740.00
<br />11.
<br />2
<br />EA
<br />Survey monument
<br />135.00
<br />270.00
<br />:-
<br />12.
<br />560
<br />LF
<br />48" SO
<br />144.00
<br />80,640.00
<br />13.
<br />90
<br />IF
<br />42" SO
<br />140.00
<br />12,600.00
<br />14.
<br />300
<br />LF
<br />33" SD
<br />108.00
<br />32,400.00
<br />15.
<br />330
<br />IF
<br />27" SO
<br />81.00
<br />26,730.00
<br />( 16.
<br />120
<br />LF
<br />21" SD
<br />63.00
<br />s 7,560.00
<br />r
<br />17.
<br />LSO
<br />LF
<br />18" SD
<br />46.00
<br />* 8,280.00
<br />?„
<br />18.
<br />6
<br />EA
<br />Type I cutch basin
<br />1,850.00
<br />11,100.00
<br />19.
<br />6
<br />EA
<br />Type II catch basin
<br />2,100.00
<br />12,600.00
<br />20.
<br />8
<br />EA
<br />Storm drain plugs
<br />150.00
<br />1,200.00
<br />'a
<br />21.
<br />1
<br />EA
<br />Major dewater structure
<br />34,000.00
<br />34,000.00
<br />_
<br />22.
<br />1,100
<br />LF
<br />Utility duct bank
<br />55.00
<br />60,500.00
<br />23.
<br />1
<br />EA
<br />Fire alarm
<br />3,850.00
<br />3,850.00
<br />24.
<br />1,100
<br />LF
<br />Median landscaping
<br />40.00
<br />44,000.00
<br />25.
<br />6
<br />FA
<br />Double arm electrolier
<br />3,100.0
<br />18,600.00
<br />26.
<br />1,100
<br />LF
<br />Electrical conduit 6 wire
<br />7.00
<br />7,700.00
<br />27.
<br />LOT
<br />LS
<br />Signing, striping d marking
<br />Lump Sum
<br />9,800.00
<br />28.
<br />2
<br />EA
<br />Lagoon entrance structure
<br />10, WO.00
<br />20,000.00
<br />TOTAL ESTI.MATED CONSTRUCTION COST
<br />611,504.00
<br />182 ENGINEERING
<br />110,071.00
<br />TOTAL CONSTRUCTION COST
<br />$721,575.00
<br />b. Bridges
<br />(Area
<br />"F" - Unit 2)
<br />4
<br />1.
<br />1
<br />FA
<br />Reinforced concrete bridge
<br />S 1,097,500.00 $1,097,500.00
<br />182 ENGINEERING
<br />5
<br />197,550.00
<br />TOTAL CONSTRUCTION COST
<br />$1,295,050.00
<br />Only 50% of the estimated bridge
<br />construction cost,
<br />or $647,525.00 will be spent in
<br />1987.