Laserfiche WebLink
28 <br />PROJECT ESTIMATE <br />FOR <br />IMPROVEMENTS SCHEDULED TO BE COMPLETED <br />IN 1987 <br />AREA C, UNIT 1 <br />REDWOOD SHORES PAR1,WAY <br />1. ROADWAY <br />a. Right <br />of Way <br />Item <br />Quantity <br />Unit <br />Description <br />Unit Price <br />Amount <br />AREA C <br />UNIT 1 <br />1. <br />LOT <br />LS <br />Strip site, dispose of debris <br />Lump Sum <br />7,700.00 <br />2. <br />127,600 <br />SF <br />Excavation 6 embankment for R/H <br />$ 0.34 <br />43,384.00 <br />3. <br />2,200 <br />LF <br />Type A curb 6 gutter <br />9.30 <br />21,560.00 <br />4. <br />2,200 <br />LF <br />Type B curb S gutter <br />8.75 <br />19,250.00 <br />S. <br />50,600 <br />SF <br />4" Asphalt concrete <br />0.95 <br />48,070.00 <br />6. <br />50,600 <br />SF <br />8" Claes 2 AB <br />0.53 <br />27,830.00 <br />.� <br />7. <br />50,600 <br />SF <br />10" Class 2 ASH <br />0.60 <br />30,360.00 <br />t,; <br />8. <br />8,800 <br />SF <br />3-1/2" AC bike path <br />1.50 <br />13,200.00 <br />= <br />9. <br />4,400 <br />SF <br />3-1/2" Conc. sidewalk <br />1.95 <br />48,580.00 <br />10. <br />4 <br />EA <br />Handicap ramp <br />185.00 <br />740.00 <br />11. <br />2 <br />EA <br />Survey monument <br />135.00 <br />270.00 <br />:- <br />12. <br />560 <br />LF <br />48" SO <br />144.00 <br />80,640.00 <br />13. <br />90 <br />IF <br />42" SO <br />140.00 <br />12,600.00 <br />14. <br />300 <br />LF <br />33" SD <br />108.00 <br />32,400.00 <br />15. <br />330 <br />IF <br />27" SO <br />81.00 <br />26,730.00 <br />( 16. <br />120 <br />LF <br />21" SD <br />63.00 <br />s 7,560.00 <br />r <br />17. <br />LSO <br />LF <br />18" SD <br />46.00 <br />* 8,280.00 <br />?„ <br />18. <br />6 <br />EA <br />Type I cutch basin <br />1,850.00 <br />11,100.00 <br />19. <br />6 <br />EA <br />Type II catch basin <br />2,100.00 <br />12,600.00 <br />20. <br />8 <br />EA <br />Storm drain plugs <br />150.00 <br />1,200.00 <br />'a <br />21. <br />1 <br />EA <br />Major dewater structure <br />34,000.00 <br />34,000.00 <br />_ <br />22. <br />1,100 <br />LF <br />Utility duct bank <br />55.00 <br />60,500.00 <br />23. <br />1 <br />EA <br />Fire alarm <br />3,850.00 <br />3,850.00 <br />24. <br />1,100 <br />LF <br />Median landscaping <br />40.00 <br />44,000.00 <br />25. <br />6 <br />FA <br />Double arm electrolier <br />3,100.0 <br />18,600.00 <br />26. <br />1,100 <br />LF <br />Electrical conduit 6 wire <br />7.00 <br />7,700.00 <br />27. <br />LOT <br />LS <br />Signing, striping d marking <br />Lump Sum <br />9,800.00 <br />28. <br />2 <br />EA <br />Lagoon entrance structure <br />10, WO.00 <br />20,000.00 <br />TOTAL ESTI.MATED CONSTRUCTION COST <br />611,504.00 <br />182 ENGINEERING <br />110,071.00 <br />TOTAL CONSTRUCTION COST <br />$721,575.00 <br />b. Bridges <br />(Area <br />"F" - Unit 2) <br />4 <br />1. <br />1 <br />FA <br />Reinforced concrete bridge <br />S 1,097,500.00 $1,097,500.00 <br />182 ENGINEERING <br />5 <br />197,550.00 <br />TOTAL CONSTRUCTION COST <br />$1,295,050.00 <br />Only 50% of the estimated bridge <br />construction cost, <br />or $647,525.00 will be spent in <br />1987. <br />