My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt82 DDA Redwood Shores Inc. GID 1-64
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1982
>
Agmt82 DDA Redwood Shores Inc. GID 1-64
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:14:09 PM
Creation date
5/14/2018 12:08:16 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Redwood Shores Inc.
PROJECT NAME
GID 64
RMP File Number
304
Date
6/16/1982
MO Ref
SEE ORD 1859
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
29 <br />I1. WATER SYSTEMS <br />a. Linea <br />ITEM QUANTITY UNIT DESCRIPTION <br />AREA F — UNIT I <br />UNIT PRICE AMOUNT TOTAL <br />t <br />1. <br />1,300 <br />LF <br />16" Water line <br />65.00 <br />$84,500.00 <br />2. <br />2. <br />1 <br />EA <br />16" Butterfly valve <br />3,050.00 <br />3,050.00 <br />-, <br />3. <br />4 <br />EA <br />Air release valve <br />825.00 <br />3,300.00 <br />EA <br />4. <br />LOT <br />LS <br />Yes[ and sterilize <br />Lump Sum <br />EA <br />9. <br />5. <br />180 <br />LF <br />12" Water line <br />44.00 <br />7,920. JO <br />V" <br />6. <br />2 <br />EA <br />12" Valve <br />1,725.00 <br />3,450.00 <br />850.00 <br />7. <br />2 <br />EA <br />Fire hydrant assembly <br />2,900.00 <br />5.81)D, 00 <br />$91.660.00 <br />8. <br />3 <br />EA <br />1-1/2" Blowoff assembly <br />850.00 <br />21550.00 <br />y <br />9. <br />2 <br />EA <br />Irrigation service <br />1,600.00 <br />3 200 00 <br />AREA G <br />— UNIT 1 <br />71,500.00 <br />1. <br />1,100 <br />LF <br />2. <br />1 <br />EA <br />3. <br />3 <br />EA <br />4. <br />LOT <br />LS <br />I_ 5. <br />30 <br />LF <br />6. <br />2 <br />EA <br />7. <br />2 <br />EA <br />8. <br />1 <br />EA <br />9. <br />3 <br />EA <br />CJ <br />TOTAL $115,620.00 $115,620.00 <br />16" Water line <br />65.00 <br />71,500.00 <br />i <br />16" Butterfly valve <br />3,050.00 <br />3,050.00 <br />-Sr <br />Air release valve <br />825.00 <br />2,475.00 <br />j <br />Teat and sterilize <br />lump Sum <br />1,425.00 <br />8" Water line <br />32.00 <br />960.00 <br />8" Gate valve <br />1,150.00 <br />2,300.00„+, <br />Fire hydrant assembly <br />2,900.00 <br />5,800.00 <br />G: <br />Irrigation service <br />1,600.00 <br />1,600.00 <br />1-1/2" Blowoff valve <br />850.00 <br />2,550.00 <br />TOTAL <br />$91,660.00 <br />$91.660.00 <br />3207,280`00 <br />t <br />y, <br />18Z ENGINEERING <br />$ 37,3L1.00 <br />TOTAL CONSTRUCTION CGSr <br />$244,591.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.