Laserfiche WebLink
36 <br />II. WATER SYST&NS <br />a. Lines <br />ITEM QUANTITY UNIT DESCRIPTION <br />AREA F - UNIT 2 <br />■i .� iL, it , iOFMMI ni .. ii <br />UNIT PRICE MOUNT TOTAL <br />i <br />1. <br />1,260 <br />LF <br />16" Water Line <br />65.00 <br />$81,900.00 <br />2. <br />1 <br />EA <br />16" Butterfly valve <br />$3,050.00 <br />$ 3,050.00 <br />3. <br />4 <br />EA <br />Air release valve <br />$ 825.00 <br />$ 3,300.00 <br />t <br />4. <br />LOT <br />LS <br />Test and sterilize <br />Lump Sum <br />$ 1,675.00 <br />a _ <br />5. <br />75 <br />LF <br />8" Water Line <br />32.00 <br />$ 2,400.00 <br />G� - <br />6. <br />2 <br />EA <br />Fire hydrant assembly <br />$2,900.00 <br />$ 5,000.00 <br />F+ <br />7. <br />1 <br />EA <br />1-1/2" Blowoff <br />850.00 <br />$ 850.00 <br />8. <br />1 <br />EA <br />Irrigation service <br />$1,600,00 <br />$ 1,600.00 <br />TOTAL 100,575.00 $100,575.00fr <br />_ <br />18% ENGINEERING 18,104.00?- <br />TOTAL CONSTRUCTION COST $113.679.00 (�: <br />