Laserfiche WebLink
37 <br />III. SANITARY SEWERS <br />a. Linea <br />ITEM <br />QUANTITY <br />UNIT <br />DESCRIPTION <br />LIMIT PRICE <br />AMOUNT <br />TOTAL <br />AREA F <br />- UNIT 2 <br />1. <br />1 <br />EA <br />Modified manhole <br />Lump Sum <br />$15,000.00 <br />2. <br />585 <br />LF <br />8" VCP <br />65.00 <br />538,025.00 <br />3. <br />4 <br />EA <br />Type A sever MN <br />2,400.00 <br />L9 <br />TOTAL: <br />62,625.00 <br />$62,625.00 <br />7J <br />7 <br />AREA G <br />- UNIT 2 <br />� <br />N <br />1. <br />1 <br />EA <br />Modified manhole <br />15,000.00 <br />$ 15,000.00 <br />'- <br />2 <br />900 <br />LF <br />10" VCP <br />77.00 <br />$ 69,300.00 <br />3. <br />3,200 <br />LF <br />10" Force main <br />48.00 <br />5153.600.00 <br />TOTAL: <br />$237 900,00 <br />$237.900.00 t <br />$300.525.00 <br />182 ENGINEERING <br />$ 54,095.00 " <br />TOTAL <br />CONSTRUCTION <br />COST <br />$354,620.00 ` <br />b. Pump Stations <br />AREA G - UNIT 2 <br />1. LOT LS rump Station <br />Lump Sum $275,000.00 $275,000.00 <br />18% ENGINEERING $49,500.00 <br />TOTAL CONSTRUCTION COST $324,500.00 <br />IV. PARKS <br />AREA E- UNIT 2 s AREA G- UNIT 1 <br />1. 498,000 SF Park Development $1.50 $747,000.00 $747,000.00 <br />TOTAL CONSTRUCTION COST $747,000,00 <br />0 <br />Y <br />