Laserfiche WebLink
8 <br />C� <br />40 <br />PROJECT ESTIMATE <br />FOR <br />IMPROVEMENTS SCHEDULED TO It CCiriPLETED 114 1989 <br />4 IV <br />I <br />AREA G. UNIT 2 <br />2.`. <br />MARINE WORLD PARKWAY/REDWOOD SHORES PARKWAY <br />.j <br />I. ROADWAY <br />LJ <br />` <br />a. Right <br />of Way <br />Item <br />Quantity <br />Unit <br />Description <br />Unit Price Amount <br />1. <br />LUT <br />LS <br />Strio site, dispose of debris <br />Lump Sum <br />25,850.00 <br />2. <br />429,200 <br />SF <br />Excavation d embankment for R/W <br />$ 0.34 <br />145,928.00 <br />3. <br />7,400 <br />LF <br />Type A curb d gutter <br />9.80 <br />72,520.00 <br />y <br />4. <br />7,400 <br />LF <br />Type B curb d gutter <br />3.15 <br />64,750.00 <br />ms <br />5. <br />170,200 <br />SF <br />4" Asphalt concr^te <br />0.95 <br />161,690.00 <br />r <br />t. <br />6. <br />170,200 <br />SF <br />8" Class 2 AD <br />0.55 <br />93,610.00 <br />7. <br />170,200 <br />SF <br />10" Class 2 ASH <br />0.60 <br />102,120.00 <br />8. <br />29,600 <br />SF <br />3 - 1/2" AC bike path <br />1.50 <br />44,400.00' <br />9. <br />14,800 <br />SF <br />3 - 1/2" concrete sidewalk <br />1.95 <br />28,860.00 <br />10. <br />12 <br />EA <br />Handicap ramp <br />7^5.00 <br />2,220.00 <br />O A <br />11. <br />5 <br />EA <br />Survey monument <br />135.00 <br />675.00 <br />- <br />12. <br />50 <br />LF <br />42" SO <br />140.00 <br />7,000.00 <br />13. <br />650 <br />LF <br />36" SO <br />131.00 <br />85,150.00 <br />14. <br />280 <br />LF <br />33" SO <br />108.00 <br />30,240.00 <br />15. <br />640 <br />LF <br />30" SO <br />104.00 <br />66,560.00 <br />16. <br />440 <br />LF <br />27" SD <br />81.00 <br />35,640.00 <br />17. <br />440 <br />LF <br />24" SO <br />77.00 <br />33,880.00 <br />18. <br />384 <br />LF <br />21" SO <br />63.00 <br />24,192.00 <br />19. <br />77, <br />LF <br />18" SD <br />46.00 <br />35,512.00 <br />20. <br />12 <br />EA <br />Type I catch basin <br />1,850.00 <br />22,200.00 <br />21. <br />12 <br />EA <br />Type II catch basin <br />2,100.00 <br />25,200.00 <br />22. <br />24 <br />EA <br />Storm drain plugs <br />150.00 <br />3,600.00 <br />23. <br />1 <br />EA <br />Minor dewatering structure <br />29,000.00 <br />29,000.00 <br />24. <br />1 <br />EA <br />Major dewatering structure <br />34,000.00 <br />34,000.00 <br />25. <br />3,700 <br />LF <br />Utility duct bank <br />55.00 <br />203.500.00 <br />, <br />26. <br />1 <br />EA <br />Fire alarm <br />3,850.00 <br />3,850.00 <br />5!!'•. <br />27. <br />3,700 <br />LF <br />Median landscaping <br />40.00 <br />148,000.00 <br />28. <br />19 <br />EA <br />Double arm alae Crolf er <br />3,100.00 <br />58,900.00 <br />�`.it., <br />24. <br />1,700 <br />LF <br />Elect. conduit d etre <br />7.00 <br />251900.00 <br />"ii•Y tt 'r`3,;, <br />30. <br />1 <br />EA <br />Signalized intersection <br />125,000.00 <br />125,000.00 <br />ii ! <br />31. <br />LOT <br />LS <br />Signing, striping and marking <br />Lump Sum <br />29,600.00 <br />_ <br />72. <br />1 <br />EA <br />Minor lagoon ant. structure <br />8,000.00 <br />8,000.00 <br />33. <br />1 <br />EA <br />Major lagoon ent. structure <br />10,000.00 <br />10,000.00 <br />TOTAL <br />31,787,547.00 <br />1E.: ENGINEERING <br />$321,759.00 <br />TOTAL CONSTRUCTION COST <br />$2.109,306.00 <br />- <br />b. Bridges <br />502 of the bridge construction cost <br />started in 1988 - in Area "G" Unit <br />1 <br />$647,525.00 <br />4 IV <br />