8
<br />C�
<br />40
<br />PROJECT ESTIMATE
<br />FOR
<br />IMPROVEMENTS SCHEDULED TO It CCiriPLETED 114 1989
<br />4 IV
<br />I
<br />AREA G. UNIT 2
<br />2.`.
<br />MARINE WORLD PARKWAY/REDWOOD SHORES PARKWAY
<br />.j
<br />I. ROADWAY
<br />LJ
<br />`
<br />a. Right
<br />of Way
<br />Item
<br />Quantity
<br />Unit
<br />Description
<br />Unit Price Amount
<br />1.
<br />LUT
<br />LS
<br />Strio site, dispose of debris
<br />Lump Sum
<br />25,850.00
<br />2.
<br />429,200
<br />SF
<br />Excavation d embankment for R/W
<br />$ 0.34
<br />145,928.00
<br />3.
<br />7,400
<br />LF
<br />Type A curb d gutter
<br />9.80
<br />72,520.00
<br />y
<br />4.
<br />7,400
<br />LF
<br />Type B curb d gutter
<br />3.15
<br />64,750.00
<br />ms
<br />5.
<br />170,200
<br />SF
<br />4" Asphalt concr^te
<br />0.95
<br />161,690.00
<br />r
<br />t.
<br />6.
<br />170,200
<br />SF
<br />8" Class 2 AD
<br />0.55
<br />93,610.00
<br />7.
<br />170,200
<br />SF
<br />10" Class 2 ASH
<br />0.60
<br />102,120.00
<br />8.
<br />29,600
<br />SF
<br />3 - 1/2" AC bike path
<br />1.50
<br />44,400.00'
<br />9.
<br />14,800
<br />SF
<br />3 - 1/2" concrete sidewalk
<br />1.95
<br />28,860.00
<br />10.
<br />12
<br />EA
<br />Handicap ramp
<br />7^5.00
<br />2,220.00
<br />O A
<br />11.
<br />5
<br />EA
<br />Survey monument
<br />135.00
<br />675.00
<br />-
<br />12.
<br />50
<br />LF
<br />42" SO
<br />140.00
<br />7,000.00
<br />13.
<br />650
<br />LF
<br />36" SO
<br />131.00
<br />85,150.00
<br />14.
<br />280
<br />LF
<br />33" SO
<br />108.00
<br />30,240.00
<br />15.
<br />640
<br />LF
<br />30" SO
<br />104.00
<br />66,560.00
<br />16.
<br />440
<br />LF
<br />27" SD
<br />81.00
<br />35,640.00
<br />17.
<br />440
<br />LF
<br />24" SO
<br />77.00
<br />33,880.00
<br />18.
<br />384
<br />LF
<br />21" SO
<br />63.00
<br />24,192.00
<br />19.
<br />77,
<br />LF
<br />18" SD
<br />46.00
<br />35,512.00
<br />20.
<br />12
<br />EA
<br />Type I catch basin
<br />1,850.00
<br />22,200.00
<br />21.
<br />12
<br />EA
<br />Type II catch basin
<br />2,100.00
<br />25,200.00
<br />22.
<br />24
<br />EA
<br />Storm drain plugs
<br />150.00
<br />3,600.00
<br />23.
<br />1
<br />EA
<br />Minor dewatering structure
<br />29,000.00
<br />29,000.00
<br />24.
<br />1
<br />EA
<br />Major dewatering structure
<br />34,000.00
<br />34,000.00
<br />25.
<br />3,700
<br />LF
<br />Utility duct bank
<br />55.00
<br />203.500.00
<br />,
<br />26.
<br />1
<br />EA
<br />Fire alarm
<br />3,850.00
<br />3,850.00
<br />5!!'•.
<br />27.
<br />3,700
<br />LF
<br />Median landscaping
<br />40.00
<br />148,000.00
<br />28.
<br />19
<br />EA
<br />Double arm alae Crolf er
<br />3,100.00
<br />58,900.00
<br />�`.it.,
<br />24.
<br />1,700
<br />LF
<br />Elect. conduit d etre
<br />7.00
<br />251900.00
<br />"ii•Y tt 'r`3,;,
<br />30.
<br />1
<br />EA
<br />Signalized intersection
<br />125,000.00
<br />125,000.00
<br />ii !
<br />31.
<br />LOT
<br />LS
<br />Signing, striping and marking
<br />Lump Sum
<br />29,600.00
<br />_
<br />72.
<br />1
<br />EA
<br />Minor lagoon ant. structure
<br />8,000.00
<br />8,000.00
<br />33.
<br />1
<br />EA
<br />Major lagoon ent. structure
<br />10,000.00
<br />10,000.00
<br />TOTAL
<br />31,787,547.00
<br />1E.: ENGINEERING
<br />$321,759.00
<br />TOTAL CONSTRUCTION COST
<br />$2.109,306.00
<br />-
<br />b. Bridges
<br />502 of the bridge construction cost
<br />started in 1988 - in Area "G" Unit
<br />1
<br />$647,525.00
<br />4 IV
<br />
|