Laserfiche WebLink
IF <br />a <br />i <br />41 <br />t, <br />II. WATER <br />SYSTEMS <br />a. Lines <br />F <br />Z <br />p <br />ITEM <br />OUANTITY <br />UNIT <br />DESCRIPTION UNIT PRICE <br />AMOUNT <br />TOTAL <br />o <br />AREA G <br />- UNIT 2 <br />W <br />�d <br />1. <br />3,700 <br />LF <br />16" Water Line <br />65.00 <br />240,500.00 <br />2. <br />7 <br />EA <br />16" Butterfly valve <br />3,050.00 <br />9,150.00 <br />t: <br />x <br />3. <br />12 <br />EA <br />Air release valve <br />825.00 <br />9,90U.00 <br />t' <br />4, <br />LOT <br />LS <br />Teat and sterilize <br />Lump Sum <br />5,000.00 <br />W <br />5. <br />300 <br />LF <br />8" Water line <br />72.00 <br />9,6n0.00 <br />to., <br />6. <br />3 <br />EA <br />8" Gats valve <br />1,150.00 <br />7,450.00 <br />F: <br />P, <br />7. <br />7 <br />EA <br />Fire hydrant assembly <br />2,900.00 <br />8,700.00 <br />o <br />B. <br />2 <br />EA <br />Irrigation service <br />1,600.00 <br />3.200.00 <br />ur i <br />9. <br />3 <br />EA <br />1.-1/2" Blowoff <br />850.00 <br />2,550.00 <br />4 F <br />TOTAL <br />$292,050.00 <br />$292.050.00 <br />n <br />V <br />16E ENGINEERING <br />552,569.00 <br />w <br />x <br />TOTAL CONSTRUCTION COST <br />$364,619.00 <br />III. SANITARY <br />SEWERS <br />4i <br />.y <br />7 <br />a. Lines <br />AREA G <br />- U7IT 2 <br />1. <br />1,122 <br />LF <br />8" VCP <br />65.00 <br />72,93u .00 <br />2. <br />800 <br />LF <br />B" Force main <br />46.00 <br />36,800.00 <br />3. <br />3 <br />EA <br />Sewer manhole <br />2,400.00 <br />7,200.00. <br />TOTAL <br />$116,930.00 <br />PSllb,930.00 <br />" <br />18% ENGINEERING <br />21.048.00 <br />TOTAL CONSTRUCTION COST <br />$137.978.00 <br />IV. PARRS <br />AREA F <br />- UNIT 2�. <br />1. <br />170,000 <br />SF <br />Park Development <br />$1.50 <br />S255,000.00 <br />$255,000.00 <br />i <br />t? <br />TOTAL CONSTRUCTION COST <br />$255.000.00 <br />a <br />